2009:Electrical Main 1.29.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: 1.29.2009 Start time: 6:30pm<br> End time: 9pm<br> Members present: Michael H, Rika L, Crystal V, Sean K, Apples, Oranges<br> Tasks Completed: * Sanded the driverstation thingy >&g...)
(No difference)

Revision as of 17:19, 29 January 2009

1.29.2009

Start time: 6:30pm

End time: 9pm

Members present: Michael H, Rika L, Crystal V, Sean K, Apples, Oranges

Tasks Completed:

  • Sanded the driverstation thingy >>
    * task


Tasks In Progress:

  • Working with Cuyler to re-vamp the side panel
    * Mounting the excess materials/ anything accessable to place onto the side panel i.e Jaguars, digital sidecar, ect.


Tasks to Complete:

  • Velcro whatever we can to the side panel for now
    * Driver station grounding mod.


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Test Engineering Notebook Template