2009:Electrical Main 1.29.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: 1.29.2009 Start time: 6:30pm<br> End time: 9pm<br> Members present: Michael H, Rika L, Crystal V, Sean K, Apples, Oranges<br> Tasks Completed: * Sanded the driverstation thingy >&g...) |
(No difference)
|
Revision as of 17:19, 29 January 2009
1.29.2009
Start time: 6:30pm
End time: 9pm
Members present: Michael H, Rika L, Crystal V, Sean K, Apples, Oranges
Tasks Completed:
- Sanded the driverstation thingy >>
* task
Tasks In Progress:
- Working with Cuyler to re-vamp the side panel
* Mounting the excess materials/ anything accessable to place onto the side panel i.e Jaguars, digital sidecar, ect.
Tasks to Complete:
- Velcro whatever we can to the side panel for now
* Driver station grounding mod.
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template