2009:Ccontrols20309: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(Complete daily notes)
(No difference)

Revision as of 18:14, 3 February 2009

Date: 2/3/09

Start Time: 6:30 PM

End Time: 9:30 PM

Members Present: Nick, (Eric), (Dean)

Tasks Completed:

1. Painted Secondary Control Box

2. Completed drawings for Top Plate L Brackets, Drawer Slide L Brackets and Bottom Box Plate

3. Submitted the drawings to Harris' Shop

Tasks to Complete:

1. Top Cover need to be finalized.

2. Controls need to be added to the true box.