2009:Electrical Main 2.5.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 35: Line 35:
7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean  
7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean  


<br>


<u>'''Stuff in the Process'''</u>


<u>'''Stuff in the Process'''</u>
-Schope is looking for sketmatics for our banner sensors


-Schope is looking for sketmatics for our banner sensors
-Dave and Josh are working on measuring out wiring in inventor


-Dave and Josh are working on measuring out wiring in inventor
-Rika and Cuyler are collaborating about the battery box


-Rika and Cuyler are collaborating about the battery box
-Mike and Crystal will be in the shop working on the board, velcroing, prepping wires, ect.


-Mike and Crystal will be in the shop working on the board, velcroing, prepping wires, ect.
'''<u>Completed</u>'''
 
-Banner Sensor Schematic (h/t Oranges and Sean)
 
[[Image:BannerSensor.jpg|thumb|left|Banner Sensor Schematic (It's special)]]

Revision as of 18:19, 5 February 2009

2.5.2009

Start time: 6:40pm

End time: 9pm

Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges




Burlone's Marching Orders of the Night:(¬O_o)¬

1. Battery Box - Rika/Cuyler

2. Remount Electrical (Saturday) -- Group

3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)

    -PWM cabled will be used from kit, any other long lengths will be custom terminated.

Banner Sensor Configuration:

Put together a wiring harness and use 7100's as an example - Sillyscope

4. Continue velcroing the board -- Group

5. Create Battery strap - Rika

6. Mouse Encoders - Mike and Crystal

7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean


Stuff in the Process

-Schope is looking for sketmatics for our banner sensors

-Dave and Josh are working on measuring out wiring in inventor

-Rika and Cuyler are collaborating about the battery box

-Mike and Crystal will be in the shop working on the board, velcroing, prepping wires, ect.

Completed

-Banner Sensor Schematic (h/t Oranges and Sean)

Banner Sensor Schematic (It's special)