2009:Electrical Main 2.7.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: 2.7.09 Start time: End time: Members present: <u>'''Goals:'''</u> -Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge -Measure out wires and b...)
(No difference)

Revision as of 19:46, 5 February 2009

2.7.09

Start time:

End time:

Members present:


Goals:

-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge

-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?

-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?

-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.


You guys are amazing keep it up!