2009:Electrical Main 2.7.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: 2.7.09 Start time: End time: Members present: <u>'''Goals:'''</u> -Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge -Measure out wires and b...)
 
No edit summary
Line 1: Line 1:
2.7.09
2.7.09  


Start time:
Start time: 11am


End time:
End time:  


Members present:
Members present: Dave, Dave, Rika, Sean, Collin<br>


<br>


'''<u>Tasks Completed:</u>'''


<u>'''Goals:'''</u>
*Started wiring up the electrical board
*Finished soldering and wiring a mouse!'''<u></u>'''


-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge


-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?


-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?
<u>'''Goals:'''</u>


-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.
-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge


-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?


-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?


== <span style="color: rgb(255, 0, 0);">You guys are amazing keep it up!</span> ==
-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.
 
<br>
 
== <span style="color: rgb(255, 0, 0);">You guys are amazing keep it up!</span> ==

Revision as of 12:03, 7 February 2009

2.7.09

Start time: 11am

End time:

Members present: Dave, Dave, Rika, Sean, Collin


Tasks Completed:

  • Started wiring up the electrical board
  • Finished soldering and wiring a mouse!


Goals:

-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge

-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?

-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?

-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.


You guys are amazing keep it up!