2009:Electrical Main 2.7.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 9: Line 9:
<br>  
<br>  


'''<u>Tasks Completed:</u>'''  
'''<u>Tasks Completed:</u>'''<br>


*Started wiring up the electrical board
*Finished soldering and wiring a mouse  
*Finished soldering and wiring a mouse!'''<u></u>'''
*Mounted mouse on robot (still trying to get it to work)
*Started second mouse
*Battery box is completed and made and painted!  
*Battery box is completed and made and painted!  
*Cut/prepped wires for final design
*Cut/prepped wires for final design  
*Wires BaneBot motors and Window motors
*Wires BaneBot motors and Window motors



Revision as of 21:15, 7 February 2009

2.7.09

Start time: 11am

End time:

Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell) Shell-logo.gif


Tasks Completed:

  • Finished soldering and wiring a mouse
  • Mounted mouse on robot (still trying to get it to work)
  • Started second mouse
  • Battery box is completed and made and painted!
  • Cut/prepped wires for final design
  • Wires BaneBot motors and Window motors


Goals:

-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge

-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?

-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?

-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.

-Figure out positioning of 120 Amp breaker - Near battery on the holder?



You guys are amazing keep it up!