2009:Electrical Main 2.7.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
<br> | <br> | ||
'''<u>Tasks Completed:</u>''' | '''<u>Tasks Completed:</u>'''<br> | ||
*Finished soldering and wiring a mouse | |||
*Finished soldering and wiring a mouse | *Mounted mouse on robot (still trying to get it to work) | ||
*Started second mouse | |||
*Battery box is completed and made and painted! | *Battery box is completed and made and painted! | ||
*Cut/prepped wires for final design | *Cut/prepped wires for final design | ||
*Wires BaneBot motors and Window motors | *Wires BaneBot motors and Window motors | ||
Revision as of 21:15, 7 February 2009
2.7.09
Start time: 11am
End time:
Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell)
Tasks Completed:
- Finished soldering and wiring a mouse
- Mounted mouse on robot (still trying to get it to work)
- Started second mouse
- Battery box is completed and made and painted!
- Cut/prepped wires for final design
- Wires BaneBot motors and Window motors
Goals:
-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge
-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?
-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?
-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.
-Figure out positioning of 120 Amp breaker - Near battery on the holder?