2010:Mechanical: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 5: Line 5:
#<strike>Help Drivetrain with ProE Import</strike>  
#<strike>Help Drivetrain with ProE Import</strike>  
#<strike>Have other teams review Trap Doors - Integration</strike>  
#<strike>Have other teams review Trap Doors - Integration</strike>  
#Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery<br>  
#Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery<br>
#Complete Bill of Materials  
#Complete Bill of Materials  
#Assign Surfaces for Control System Mounting  
#Assign Surfaces for Control System Mounting  
Line 20: Line 20:
#Design seperator
#Design seperator


<br>


To do lists made on 2/16/09:&nbsp; Before ship, After Ship and at RIT are found in the log entry for 2/16/09


To do lists made on 2/16/09:&nbsp; Before ship, After Ship and at RIT are found in the log entry for 2/16/09
<br>
 
<br>  


= Resources  =
= Resources  =


The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the [https://firstbasefrc.autodesk.com/?nd=kitofparts Autodesk FIRSTbase website].<br>  
The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the [https://firstbasefrc.autodesk.com/?nd=kitofparts Autodesk FIRSTbase website].<br>


= <u>'''<br>'''</u>This is the Mechanical Subteam 1's Engineering Notebook  =
= <u>'''<br>'''</u>This is the Mechanical Subteam 1's Engineering Notebook  =
Line 80: Line 80:
[[Mechanical 2.1.2009|Mechanical 2.1.2009]]  
[[Mechanical 2.1.2009|Mechanical 2.1.2009]]  


'''Week 5 - '''<span style="color: rgb(255, 0, 0);">'''''14 Days Left!!'''''</span>  
'''Week 5 - '''<span style="color: rgb(255,0,0)">'''''14 Days Left!!'''''</span>  


[[Mechanical 2.2.2009|Mechanical 2.2.2009]]  
[[Mechanical 2.2.2009|Mechanical 2.2.2009]]  
Line 94: Line 94:
[[Mechanical 2.8.2009|Mechanical 2.8.2009]]  
[[Mechanical 2.8.2009|Mechanical 2.8.2009]]  


<span style="color: rgb(255, 0, 0);">'''Week 6 - 7 Days Left!!'''</span>  
<span style="color: rgb(255,0,0)">'''Week 6 - 7 Days Left!!'''</span>  


[[Mechanical 2.9.2009|Mechanical 2.9.2009]]  
[[Mechanical 2.9.2009|Mechanical 2.9.2009]]  
Line 111: Line 111:


[[Mechanical 2.16.2009|Mechanical 2.16.2009]]  
[[Mechanical 2.16.2009|Mechanical 2.16.2009]]  
[[Mechanical 2.17.2009|Mechanical 2.17.2009]]
[[Mechanical 2.18.2009|Mechanical 2.12.2009]]
[[Mechanical 2.19.2009|Mechanical 2.13.2009]]
[[Mechanical 2.20.2009|Mechanical 2.14.2009]]
[[Mechanical 2.21.2009|Mechanical 2.15.2009]]
[[Mechanical 2.22.2009|Mechanical 2.16.2009]]


[[Mechanical 2.17.2009|Mechanical 2.17.2009]]  
[[Mechanical 2.17.2009|Mechanical 2.17.2009]]  
 
<br>
<br>  


----
----


'''''Please Label All Notebook Pages <u>Mechanical 1 X.XX.2009</u> to avoid confusion'''''.
'''''Please Label All Notebook Pages <u>Mechanical 1 X.XX.2009</u> to avoid confusion'''''.

Revision as of 20:30, 17 February 2009

Master Task List

  1. Design Motor Mounts...Done
  2. Design Bearing Mounts ...Done
  3. Help Drivetrain with ProE Import
  4. Have other teams review Trap Doors - Integration
  5. Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery
  6. Complete Bill of Materials
  7. Assign Surfaces for Control System Mounting
  8. Determine if front wheels are needed
  9. Choose & Order Materials/Parts
  10. Create Model Shop Drawings...Week 3 main focus
  11. Add all belts & pulleys to design
  12. Define Roller/Chicken Plucker designs ...Done
  13. Complete Trap Door designs in Inventor ...Done
  14. Define outside material for robot
  15. Design Sensor Mounts
  16. Design Battery Box & CRio Mount (Electrical needs help)...Finished by Rika
  17. Mock up Weight on the Chassis so programming/Drivers can use  ...Done
  18. Design seperator


To do lists made on 2/16/09:  Before ship, After Ship and at RIT are found in the log entry for 2/16/09


Resources

The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the Autodesk FIRSTbase website.


This is the Mechanical Subteam 1's Engineering Notebook

Week 1 - 42 Days Left!!

Mechanical 1 - 1.6.09

Mechanical 1 - 1.7.09

Mechanical 1 - 1.8.09

Mechanical 1 - 1.10.09

Mechanical 1 - 1.11.09

Week 2 -35 Days Left!!

Mechanical 1 - 1.13.09

Mechanical 1 - 1.14.09

Mechanical 1 - 1.15.09

Mechanical 1 - 1.17.09

Mechanical 1 - 1.18.09

Week 3 - 28 Days Left!!

Mechanical 1 - 1.20.09

Mechanical 1 - 1.21.09

Mechanical 1 - 1.22.09

Mechanical 1 - 1.24.09

Mechanical 1 - 1.25.09

Week 4 - 21 Days Left!!

Mechanical 1.27.2009

Mechanical 1.28.2009

Mechanical 1.29.2009

Mechanical 1.31.2009

Mechanical 2.1.2009

Week 5 - 14 Days Left!!

Mechanical 2.2.2009

Mechanical 2.3.2009

Mechanical 2.4.2009

Mechanical 2.5.2009

Mechanical 2.7.2009

Mechanical 2.8.2009

Week 6 - 7 Days Left!!

Mechanical 2.9.2009

Mechanical 2.10.2009

Mechanical 2.11.2009

Mechanical 2.12.2009

Mechanical 2.13.2009

Mechanical 2.14.2009

Mechanical 2.15.2009

Mechanical 2.16.2009

Mechanical 2.17.2009

Mechanical 2.12.2009

Mechanical 2.13.2009

Mechanical 2.14.2009

Mechanical 2.15.2009

Mechanical 2.16.2009

Mechanical 2.17.2009


Please Label All Notebook Pages Mechanical 1 X.XX.2009 to avoid confusion.