2026:Controls: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(Created page with "== Overall Concept ==")
 
 
(44 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Overall Concept ==
== Overall Concept ==
Box Dimensions:
{| class="wikitable" style="border-collapse: collapse; width: 37.3507%;"
|-
| style="width: 18.054%;" | [[image:IMG_3480.jpeg|300px|thumb]]
| style="width: 19.2974%;" | [[image:IMG_3481.jpeg|300px|thumb]]
|}
== Design Info ==
Paint Scheme:
== To - Do ==
== Not Started ==
<p>'''Design'''</p>
<p>'''CAD'''</p>
<p>'''CAD Assembly'''</p>
<p>'''Shop Drawings'''</p>
<p>'''Test Fitting'''</p>
<p>'''Final Assembly'''</p>
<p>'''Wiring'''</p>
== In Progress ==
<p>'''Design'''</p>
* Design concepts
<p>'''CAD'''</p>
<p>'''CAD Assembly'''</p>
<p>'''Shop Drawings'''</p>
<p>'''Test Fitting'''</p>
<p>'''Final Assembly'''</p>
<p>'''Wiring'''</p>
== Completed ==
'''Design'''
'''CAD'''
'''CAD Assembly'''
'''Shop Drawings'''
'''Test Fitting'''
'''Final Assembly'''
'''Wiring'''
== Meeting Minutes ==
'''1/10 (Sat)'''
Attendees: Sami, Clara, Byers, Eric
Work Completed:
*Design concepts
'''1/11 (Sun)'''
Attendees: Sami, Byers
Work Completed:
*Design concepts
'''1/13 (Tue)'''
Attendees:
Work Completed:
'''1/14 (Wed)'''
Attendees:
Work Completed:
'''1/15 (Thu)'''
Attendees:
Work Completed:
'''1/17 (Sat)'''
Attendees:
Work Completed:
'''1/18 (Sun)'''
Attendees:
Work Completed:
'''1/20 (Tue)'''
Attendees:
Work Completed:
'''1/21 (Wed)'''
Attendees:
Work Completed:
'''1/22 (Thu)'''
Attendees:
Work Completed:
'''1/24 (Sat)'''
Attendees:
Work Completed:
'''1/25 (Sun)'''
Attendees:
Work Completed:
'''1/27 (Tue)'''
Attendees:
Work Completed:
'''1/28 (Wed)'''
Attendees:
Work Completed:
'''1/29 (Thu)'''
Attendees:
Work Completed:
'''1/31 (Sat)'''
Attendees:
Work Completed:
'''2/1 (Sun)'''
Attendees:
Work Completed:
'''2/3 (Tue)'''
Attendees:
Work Completed:
'''2/4 (Wed)'''
Attendees:
Work Completed:
'''2/5 (Thu)'''
Attendees:
Work Completed:
'''2/7 (Sat)'''
Attendees:
Work Completed:
'''2/8 (Sun)'''
Attendees:
Work Completed:
'''2/10 (Tue)'''
Attendees:
Work Completed:
'''2/11 (Wed)'''
Attendees:
Work Completed:
'''2/12 (Thu)'''
Attendees:
Work Completed:
'''2/14 (Sat)'''
Attendees:
Work Completed:
'''2/15 (Sun)'''
Attendees:
Work Completed:
'''2/17 (Tue)'''
Attendees:
Work Completed:
'''2/18 (Wed)'''
Attendees:
Work Completed:
'''2/19 (Thu)'''
Attendees:
Work Completed:
'''2/21 (Sat)'''
Attendees:
Work Completed:
'''2/22 (Sun)'''
Attendees:
Work Completed:
'''2/24 (Tue)'''
Attendees:
Work Completed:
'''2/25 (Wed)'''
Attendees:
Work Completed:
'''2/26 (Thu)'''
Attendees:
Work Completed:
'''2/28 (Sat)'''
Attendees:
Work Completed:
'''3/1 (Sun)'''
Attendees:
Work Completed:
'''3/3 (Tue)'''
Attendees:
Work Completed:
'''3/4 (Wed)'''
Attendees:
Work Completed:
'''3/5 (Thu)'''
Attendees:
Work Completed:
'''3/7 (Sat)'''
Attendees:
Work Completed:
'''3/8 (Sun)'''
Attendees:
Work Completed:
== 2026 Controller Map ==
== Archives ==

Latest revision as of 14:42, 11 January 2026

Overall Concept

Box Dimensions:

IMG 3480.jpeg
IMG 3481.jpeg

Design Info

Paint Scheme:

To - Do

Not Started

Design

CAD

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

In Progress

Design

  • Design concepts

CAD

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

Completed

Design

CAD

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

Meeting Minutes

1/10 (Sat)

Attendees: Sami, Clara, Byers, Eric

Work Completed:

  • Design concepts

1/11 (Sun)

Attendees: Sami, Byers

Work Completed:

  • Design concepts

1/13 (Tue)

Attendees:

Work Completed:

1/14 (Wed)

Attendees:

Work Completed:

1/15 (Thu)

Attendees:

Work Completed:

1/17 (Sat)

Attendees:

Work Completed:

1/18 (Sun)

Attendees:

Work Completed:

1/20 (Tue)

Attendees:

Work Completed:

1/21 (Wed)

Attendees:

Work Completed:

1/22 (Thu)

Attendees:

Work Completed:

1/24 (Sat)

Attendees:

Work Completed:

1/25 (Sun)

Attendees:

Work Completed:

1/27 (Tue)

Attendees:

Work Completed:

1/28 (Wed)

Attendees:

Work Completed:

1/29 (Thu)

Attendees:

Work Completed:

1/31 (Sat)

Attendees:

Work Completed:

2/1 (Sun)

Attendees:

Work Completed:

2/3 (Tue)

Attendees:

Work Completed:

2/4 (Wed)

Attendees:

Work Completed:

2/5 (Thu)

Attendees:

Work Completed:

2/7 (Sat)

Attendees:

Work Completed:

2/8 (Sun)

Attendees:

Work Completed:

2/10 (Tue)

Attendees:

Work Completed:

2/11 (Wed)

Attendees:

Work Completed:

2/12 (Thu)

Attendees:

Work Completed:

2/14 (Sat)

Attendees:

Work Completed:

2/15 (Sun)

Attendees:

Work Completed:

2/17 (Tue)

Attendees:

Work Completed:

2/18 (Wed)

Attendees:

Work Completed:

2/19 (Thu)

Attendees:

Work Completed:

2/21 (Sat)

Attendees:

Work Completed:

2/22 (Sun)

Attendees:

Work Completed:

2/24 (Tue)

Attendees:

Work Completed:

2/25 (Wed)

Attendees:

Work Completed:

2/26 (Thu)

Attendees:

Work Completed:

2/28 (Sat)

Attendees:

Work Completed:

3/1 (Sun)

Attendees:

Work Completed:

3/3 (Tue)

Attendees:

Work Completed:

3/4 (Wed)

Attendees:

Work Completed:

3/5 (Thu)

Attendees:

Work Completed:

3/7 (Sat)

Attendees:

Work Completed:

3/8 (Sun)

Attendees:

Work Completed:

2026 Controller Map

Archives