2026:Controls: Difference between revisions
| (One intermediate revision by the same user not shown) | |||
| Line 7: | Line 7: | ||
|} | |} | ||
== Design Info | == Design Info == | ||
Paint Scheme: | Paint Scheme: | ||
| Line 23: | Line 23: | ||
<p>'''Design'''</p> | <p>'''Design'''</p> | ||
* Design | * Design concepts | ||
<p>'''CAD'''</p> | <p>'''CAD'''</p> | ||
<p>'''CAD Assembly'''</p> | <p>'''CAD Assembly'''</p> | ||
Latest revision as of 14:42, 11 January 2026
Overall Concept
Box Dimensions:
Design Info
Paint Scheme:
To - Do
Not Started
Design
CAD
CAD Assembly
Shop Drawings
Test Fitting
Final Assembly
Wiring
In Progress
Design
- Design concepts
CAD
CAD Assembly
Shop Drawings
Test Fitting
Final Assembly
Wiring
Completed
Design
CAD
CAD Assembly
Shop Drawings
Test Fitting
Final Assembly
Wiring
Meeting Minutes
1/10 (Sat)
Attendees: Sami, Clara, Byers, Eric
Work Completed:
- Design concepts
1/11 (Sun)
Attendees: Sami, Byers
Work Completed:
- Design concepts
1/13 (Tue)
Attendees:
Work Completed:
1/14 (Wed)
Attendees:
Work Completed:
1/15 (Thu)
Attendees:
Work Completed:
1/17 (Sat)
Attendees:
Work Completed:
1/18 (Sun)
Attendees:
Work Completed:
1/20 (Tue)
Attendees:
Work Completed:
1/21 (Wed)
Attendees:
Work Completed:
1/22 (Thu)
Attendees:
Work Completed:
1/24 (Sat)
Attendees:
Work Completed:
1/25 (Sun)
Attendees:
Work Completed:
1/27 (Tue)
Attendees:
Work Completed:
1/28 (Wed)
Attendees:
Work Completed:
1/29 (Thu)
Attendees:
Work Completed:
1/31 (Sat)
Attendees:
Work Completed:
2/1 (Sun)
Attendees:
Work Completed:
2/3 (Tue)
Attendees:
Work Completed:
2/4 (Wed)
Attendees:
Work Completed:
2/5 (Thu)
Attendees:
Work Completed:
2/7 (Sat)
Attendees:
Work Completed:
2/8 (Sun)
Attendees:
Work Completed:
2/10 (Tue)
Attendees:
Work Completed:
2/11 (Wed)
Attendees:
Work Completed:
2/12 (Thu)
Attendees:
Work Completed:
2/14 (Sat)
Attendees:
Work Completed:
2/15 (Sun)
Attendees:
Work Completed:
2/17 (Tue)
Attendees:
Work Completed:
2/18 (Wed)
Attendees:
Work Completed:
2/19 (Thu)
Attendees:
Work Completed:
2/21 (Sat)
Attendees:
Work Completed:
2/22 (Sun)
Attendees:
Work Completed:
2/24 (Tue)
Attendees:
Work Completed:
2/25 (Wed)
Attendees:
Work Completed:
2/26 (Thu)
Attendees:
Work Completed:
2/28 (Sat)
Attendees:
Work Completed:
3/1 (Sun)
Attendees:
Work Completed:
3/3 (Tue)
Attendees:
Work Completed:
3/4 (Wed)
Attendees:
Work Completed:
3/5 (Thu)
Attendees:
Work Completed:
3/7 (Sat)
Attendees:
Work Completed:
3/8 (Sun)
Attendees:
Work Completed: