2009:Electrical Meeting 10.22: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
*fix the moue wire labels.<br> | *fix the moue wire labels.<br> | ||
<br> | |||
Mouse wire layout: | Mouse wire layout: | ||
Line 26: | Line 26: | ||
*Finished the mouse wire layout.<br> | *Finished the mouse wire layout.<br> | ||
<br> | |||
<br> | |||
Next week's meeting: | Next week's meeting: | ||
*Rofl(Waffle)-Bot needs to be fixed | *Rofl(Waffle)-Bot needs to be fixed | ||
*design a cover for the back of the control box | |||
*PUT MOUSE BALL BACK IN!!! |
Revision as of 15:57, 22 October 2009
Attendance: Mike H, Tom P, Vaughn, Crystal V, Matthieu D, Andy M, Dave and Dave, Jeff.
Goals of the night:
- Finish the Mouse repairs
- fix the moue wire labels.
Mouse wire layout:
XA=AD2
XB=BD2
YA=AD1
YB=BD1
Progress and Completion:
- Finished the mouse wire layout.
Next week's meeting:
- Rofl(Waffle)-Bot needs to be fixed
- design a cover for the back of the control box
- PUT MOUSE BALL BACK IN!!!