2010:Mechanical: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
= Master Task List  =
= Preseason =


#<strike>Design Motor Mounts...Done</strike>
Break into three groups.
#<strike>Design Bearing Mounts ...Done</strike>
#<strike>Help Drivetrain with ProE Import</strike>
#<strike>Have other teams review Trap Doors - Integration</strike>
#Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery<br>
#Complete Bill of Materials
#Assign Surfaces for Control System Mounting
#<strike>Determine if front wheels are needed</strike>
#Choose &amp;&nbsp;Order Materials/Parts
#<strike>Create Model Shop Drawings...Week 3 main focus</strike>
#Add all belts &amp;&nbsp;pulleys to design
#<strike>Define Roller/Chicken Plucker designs ...Done</strike>
#<strike>Complete Trap Door designs in Inventor ...Done</strike>
#<strike>Define outside material for robot</strike>
#<strike>Design Sensor Mounts</strike>
#<strike>Design Battery Box &amp;&nbsp;CRio Mount (Electrical needs help)...Finished by Rika</strike>
#<strike>Mock up Weight on the Chassis so programming/Drivers can use&nbsp; ...Done</strike>
#Design seperator
 
<br>
 
To do lists made on 2/16/09:&nbsp; Before ship, After Ship and at RIT are found in the log entry for 2/16/09
 
<br>


= Resources  =
= Resources  =

Revision as of 08:35, 28 October 2009

Preseason

Break into three groups.

Resources

The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the Autodesk FIRSTbase website.


This is the Mechanical Subteam 1's Engineering Notebook

Week 1 - 42 Days Left!!

Mechanical 1 - 1.6.09

Mechanical 1 - 1.7.09

Mechanical 1 - 1.8.09

Mechanical 1 - 1.10.09

Mechanical 1 - 1.11.09

Week 2 -35 Days Left!!

Mechanical 1 - 1.13.09

Mechanical 1 - 1.14.09

Mechanical 1 - 1.15.09

Mechanical 1 - 1.17.09

Mechanical 1 - 1.18.09

Week 3 - 28 Days Left!!

Mechanical 1 - 1.20.09

Mechanical 1 - 1.21.09

Mechanical 1 - 1.22.09

Mechanical 1 - 1.24.09

Mechanical 1 - 1.25.09

Week 4 - 21 Days Left!!

Mechanical 1.27.2009

Mechanical 1.28.2009

Mechanical 1.29.2009

Mechanical 1.31.2009

Mechanical 2.1.2009

Week 5 - 14 Days Left!!

Mechanical 2.2.2009

Mechanical 2.3.2009

Mechanical 2.4.2009

Mechanical 2.5.2009

Mechanical 2.7.2009

Mechanical 2.8.2009

Week 6 - 7 Days Left!!

Mechanical 2.9.2009

Mechanical 2.10.2009

Mechanical 2.11.2009

Mechanical 2.12.2009

Mechanical 2.13.2009

Mechanical 2.14.2009

Mechanical 2.15.2009

Mechanical 2.16.2009 - Conveyor Redesign Discussion

Mechanical 2.17.2009

After Ship

Mechanical 2.18.2009

Mechanical 2.19.2009

Mechanical 2.20.2009

Mechanical 2.21.2009

Mechanical 2.22.2009

Mechanical 2.23.2009

Mechanical 2.28.2009

Mechanical 3.1.2009

Mechanical 3.3.2009

Mechanical 4.16.2009

To insert a new page using the rich editor, type the text like you see above (ie Mechanical X.XX.2009), highlight it and then select the little link button at the top, then retype your (Mechanical X.XX.2009) page.



Please Label All Notebook Pages Mechanical 1 X.XX.2009 to avoid confusion.