2010:Controls 01.26: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance: = Crystal, Averill, Karen = Tasks: = *Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP. *Switch the...)
 
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Attendance: =
= Attendance: =


Crystal, Averill, Karen
Crystal, Averill, Fellows


= Tasks:  =


*Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.
*Switch the joystick screws to black screws


= Tasks: =
= Progress: =


*Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.
*We're awesome. What can I say?
*Switch the joystick screws to plack screws
*Sheet metal has been updated to the official dimensions!<br>[[Image:SheetMetalAssembly.jpg]]

Latest revision as of 18:32, 26 January 2010

Attendance:

Crystal, Averill, Fellows

Tasks:

  • Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.
  • Switch the joystick screws to black screws

Progress:

  • We're awesome. What can I say?
  • Sheet metal has been updated to the official dimensions!
    SheetMetalAssembly.jpg