2010:Drivetrain 01.19: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 1: Line 1:
XX.XX.2010  
01.19.2010  


'''Start time: '''6:54<br>  
'''Start time: '''6:54<br>  
Line 31: Line 31:
'''Tasks to Complete: '''<br>  
'''Tasks to Complete: '''<br>  


*Design wheel gaurds&nbsp; <br>
*Design wheel gaurds&nbsp; <br>  
*Design articulating side ball gaurds<br>
*Design articulating side ball gaurds<br>  
*Order new drive train metal work<br>
*Order new drive train metal work<br>  
*Chassis brachets (8), motor mounts (4), front skid gaurds (2), rear skid guard (1)<br>
*Chassis brachets (8), motor mounts (4), front skid gaurds (2), rear skid guard (1)<br>



Latest revision as of 04:40, 28 January 2010

01.19.2010

Start time: 6:54

End time:

Members present: Tresten.R Lizzy.M Graeme.B Matt.M Ben.S Alex.R

Members Attending Next Meeting: Josh.G


Tasks Completed:

  • task
  • task



Tasks In Progress:

  • Brainstorming articulating side ball gaurds
  • Brainstorming wheel gaurds



Tasks to Complete:

  • Design wheel gaurds 
  • Design articulating side ball gaurds
  • Order new drive train metal work
  • Chassis brachets (8), motor mounts (4), front skid gaurds (2), rear skid guard (1)



Materials Needed:

  • item
  • item

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)