2010:Electrical Main 02.02: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
02.02.2010  
02.02.2010  


'''Start time: '''<br>  
'''Start time: '''6PM<br>  


'''End time: '''<br>  
'''End time: '''9PM<br>  


'''Members present: '''<br>  
'''Members present: '''Dave squared, Tom, Vaughn, Mike H, Matthieu<br>  


'''Members Attending Next Meeting: '''<br>  
'''Members Attending Next Meeting: '''<br>  
Line 13: Line 13:
'''Tasks Completed:'''<br>  
'''Tasks Completed:'''<br>  


*task<br>  
*Thinking<br>
*task


<br>  
<br>  
Line 22: Line 21:
'''Tasks In Progress:'''<br>  
'''Tasks In Progress:'''<br>  


*task <br>  
*Battery Casing Design<br>
*task
 
The Battery Casing needs a picture of it with the rest of the robot uploaded. Also needs a few final design measurments.
 
*Electrical Board Placement<br>


<br>  
<br>  
Line 29: Line 31:
----
----


'''Tasks to Complete: '''<br>  
'''Tasks to Complete: '''
 
*Battery Casing Design
*Electrical Board Placement<br>
 
 


*task <br>
*task


<br>


----
----
Line 40: Line 44:
'''Materials Needed: ''' <br>  
'''Materials Needed: ''' <br>  


*item <br>
*None
*item
 
 


Do not forget to add your needed items to the [[ShoppingList|Shopping List]]!!  
Do not forget to add your needed items to the [[ShoppingList|Shopping List]]!!  

Revision as of 18:27, 2 February 2010

02.02.2010

Start time: 6PM

End time: 9PM

Members present: Dave squared, Tom, Vaughn, Mike H, Matthieu

Members Attending Next Meeting:


Tasks Completed:

  • Thinking



Tasks In Progress:

  • Battery Casing Design

The Battery Casing needs a picture of it with the rest of the robot uploaded. Also needs a few final design measurments.

  • Electrical Board Placement



Tasks to Complete:

  • Battery Casing Design
  • Electrical Board Placement




Materials Needed:

  • None


Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)

Battery Placement
cRIO Placement
Mock Electrical Board Positioning