2010:Electrical Main 02.04: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
mNo edit summary
No edit summary
Line 3: Line 3:
'''Start time: '''5:30PM<br>  
'''Start time: '''5:30PM<br>  


'''End time: '''9:30PM<br>  
'''End time: '''10PM<br>  


'''Members present: '''Mike H, Dave S, Vaughn, Kevin, Tom, Matthieu<br>  
'''Members present: '''Mike H, Dave S, Vaughn, Kevin, Tom, Matthieu<br>  

Revision as of 19:48, 4 February 2010

02.04.2010

Start time: 5:30PM

End time: 10PM

Members present: Mike H, Dave S, Vaughn, Kevin, Tom, Matthieu


Tasks Completed:

  • selected the sensor for the lifting winch to be a multiturn potentiometer (Bourns 3540S-1-103) - we have several already (5, 4 tested, 1 broken)
  • Prices determined for lexan on McMaster-Carr, from Home Depot, and Debbie's.  Home Depot had the best price for 3/16" with an 18" x 24" panel, at $19.~~.



Tasks In Progress:

  • Order spare crimp connectors
  • KEEPING ELECTRICAL SHELVES ORGANIZED!  DOOOOOOO IIIIIIIIIIT!!!!!



Tasks to Complete:

  • Mark components on electrical board once lexan comes in (hopefully on Saturday)



Materials Needed:

  • Spare Connectors of all sizes

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)