2010:Electrical Main 02.07: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
02.07.2010  
02.07.2010  


'''Start time: '''11am <br>  
'''Start time: '''11am <br>


'''End time: '''<br>  
'''End time: '''<br>


'''Members present: '''Mike Hartman, Crystal, Karen F., Dave S.&nbsp; - NOTE Combined Controls &amp; Main meeting<br>  
'''Members present: '''Mike Hartman, Crystal, Karen F., Dave S.&nbsp; - NOTE Combined Controls &amp; Main meeting<br>


'''Members Attending Next Meeting: '''<br>  
'''Members Attending Next Meeting: '''<br>


----
----


'''Tasks Completed:'''<br>  
'''Tasks Completed:'''<br>


*Mike worked on wiring the Electrical control board.&nbsp; <br>
*Mike worked on wiring the Electrical control board.&nbsp;  
*task
*estimated lengths of hardware (machine bolts) we will need to attach electrical components to new board - found some of them in the stock we have.
*put PWM cable on one of the 10-turn pots we are using for the lifting winch sensor.
*found our stash of servos


<br>  
<br>


----
----


'''Tasks In Progress:'''<br>  
'''Tasks In Progress:'''<br>


*task <br>
*task  
*task
*task


<br>  
<br>


----
----


'''Tasks to Complete: '''<br>  
'''Tasks to Complete: '''<br>


*task <br>
*build electrical board
*task
*task


<br>  
<br>


----
----


'''Materials Needed: ''' <br>  
'''Materials Needed: '''<br>


*item <br>
*item  
*item
*item



Revision as of 12:33, 7 February 2010

02.07.2010

Start time: 11am

End time:

Members present: Mike Hartman, Crystal, Karen F., Dave S.  - NOTE Combined Controls & Main meeting

Members Attending Next Meeting:


Tasks Completed:

  • Mike worked on wiring the Electrical control board. 
  • estimated lengths of hardware (machine bolts) we will need to attach electrical components to new board - found some of them in the stock we have.
  • put PWM cable on one of the 10-turn pots we are using for the lifting winch sensor.
  • found our stash of servos



Tasks In Progress:

  • task
  • task



Tasks to Complete:

  • build electrical board
  • task



Materials Needed:

  • item
  • item

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)