This is a list created to help us track the preparations for Atlanta.  There is A LOT to be done, and we need everyone's help to do it.  PLEASE pitch in and sign up for things if you haven't already.  
This is a list created to help us track the preparations for Atlanta.  There is A LOT to be done, and we need everyone's help to do it.  PLEASE pitch in and sign up for things if you haven't already.  


<br>
<br>  


'''General List'''  
'''General List'''  


1. Unpack items from Boston -&nbsp;??
1. Unpack items from Boston - Jeff


2. Repack items for Atlanta -&nbsp;??
2. Repack items for Atlanta - Jeff


3. Video Tape the Chairmans Presentation - Shauna/Becca/Kyle  
3. Video Tape the Chairmans Presentation - Shauna/Becca/Kyle  
Line 17: Line 17:
5. Thunderbolts - Kim  
5. Thunderbolts - Kim  


6. Rookie Meet &amp; Greet Booklet - Cynette <br>
6. Rookie Meet &amp; Greet Booklet - Cynette <br>  


&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 6a. Rookie Research -&nbsp;??  
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 6a. Rookie Research -&nbsp;??  
Line 29: Line 29:
10. Sponsor Email - Val Drake  
10. Sponsor Email - Val Drake  


11. Make More Buttons -&nbsp;Mrs. Wolf and all others welcome.
11. Make More Buttons -&nbsp;Mrs. Wolf and all others welcome.  


12. Collect Boston Smugmug Photos -&nbsp;??  
12. Collect Boston Smugmug Photos -&nbsp;??  
Line 43: Line 43:
17. Update Robot Sheet - Kim  
17. Update Robot Sheet - Kim  


18. New Chairmans Packets -&nbsp;??
18. New Chairmans Packets - Leann
 
19. Prep for Atlanta PR presentation - Lee Drake/Crystal


<br>'''Robot List'''  
<br>'''Robot List'''  


1. Fix Potentiometer Issues -&nbsp;??
1. Fix Potentiometer Mount &amp; Test on Arrival - Mike W., Mike H.
 
2. Program Underglow - Justin B.<br>
 
3. Autonomous Code for tower blocking - Done and Checked In, Awaiting Testing<br>
 
3.5.&nbsp; Swap autonomous up/down buttons - Jeff D.
 
4. Manual Mode Lifter Code work - Calvin D.<br>


2. Program Underglow -&nbsp;??
5. Fix Welds on lifter -&nbsp;Mike W.<br>


3. Autonomous Code for tower blocking -&nbsp;??
6. Make Second Lifter Structure - Amy Averill, Tom K.


4. Manual Mode Lifter Code work -&nbsp;??
7. Order spare Electrical parts (Omron sensors, Multimeter, Current Meter) - Dave S., Mike H.


5. Fix Welds on lifter -&nbsp;??
8. Order spare gas shock and any other "hard to replace" mech parts - Tom K.


6. Make Second Lifter Structure - Amy Averill
9. Ensure we have spare drivetrain transmission - Tom C.

Latest revision as of 15:37, 30 March 2010

List of Tasks & Leaders for Atlanta Preparations 2010

This is a list created to help us track the preparations for Atlanta.  There is A LOT to be done, and we need everyone's help to do it.  PLEASE pitch in and sign up for things if you haven't already.


General List

1. Unpack items from Boston - Jeff

2. Repack items for Atlanta - Jeff

3. Video Tape the Chairmans Presentation - Shauna/Becca/Kyle

4. Practice the Chairmans Presentation - Shauna/Becca/Kyle

5. Thunderbolts - Kim

6. Rookie Meet & Greet Booklet - Cynette

         6a. Rookie Research - ??

7. Rookie Meet & Greet Planning - Cynette/Crystal/Lee

8. Press Releases - ??

9. Sponsor Newsletter - Matthieu/Val Drake

10. Sponsor Email - Val Drake

11. Make More Buttons - Mrs. Wolf and all others welcome.

12. Collect Boston Smugmug Photos - ??

13. Work on Scouting Laptops - Matthieu

14. PRINT Pit Scouting & Match Prep Sheets - Kyle

15. Make Master Schedule - Kim

16. Coordinate Signups for Championship Conferences - ??

17. Update Robot Sheet - Kim

18. New Chairmans Packets - Leann

19. Prep for Atlanta PR presentation - Lee Drake/Crystal


Robot List

1. Fix Potentiometer Mount & Test on Arrival - Mike W., Mike H.

2. Program Underglow - Justin B.

3. Autonomous Code for tower blocking - Done and Checked In, Awaiting Testing

3.5.  Swap autonomous up/down buttons - Jeff D.

4. Manual Mode Lifter Code work - Calvin D.

5. Fix Welds on lifter - Mike W.

6. Make Second Lifter Structure - Amy Averill, Tom K.

7. Order spare Electrical parts (Omron sensors, Multimeter, Current Meter) - Dave S., Mike H.

8. Order spare gas shock and any other "hard to replace" mech parts - Tom K.

9. Ensure we have spare drivetrain transmission - Tom C.