2009:Electrical Main 1.27.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
(One intermediate revision by one other user not shown)
Line 15: Line 15:
*more updates to the BOM<br>  
*more updates to the BOM<br>  
*Side electrical board is in main robot design in inventor  
*Side electrical board is in main robot design in inventor  
*cut Lexan for side electrical board
*cut Lexan for side electrical board  
*cut Lexan for cRIO mounting plate<br>


<br>  
<br>  
Line 23: Line 24:
'''Tasks In Progress:'''<br>  
'''Tasks In Progress:'''<br>  


*design and fabricate battery box  
*design and fabricate battery box<br>
*measure and fabricate cRIO mounting plate
*keep updating BOM  
*keep updating BOM  
*thinking about the Game
*thinking about the Game
Line 34: Line 34:
'''Tasks to Complete: '''<br>  
'''Tasks to Complete: '''<br>  


*
*Find hardware to mount protective cover on electronics (Standoffs, Bolts, Nuts, Spacers)<br>
*task
*Find/buy Lexan to make protective cover (goes over side electrical board)
*Mount Mechanism (Jaguar) controllers on side board
*Count up I/O and determine number of side cars necessary


<br>  
<br>  


----
----

Latest revision as of 13:38, 14 November 2010


1.27.2009

Start time: 6:30

End time:

Members present: Mike, Crystal, Rika, Collin, Apples, Oranges, Sean


Tasks Completed:

  • more updates to the BOM
  • Side electrical board is in main robot design in inventor
  • cut Lexan for side electrical board
  • cut Lexan for cRIO mounting plate



Tasks In Progress:

  • design and fabricate battery box
  • keep updating BOM
  • thinking about the Game



Tasks to Complete:

  • Find hardware to mount protective cover on electronics (Standoffs, Bolts, Nuts, Spacers)
  • Find/buy Lexan to make protective cover (goes over side electrical board)
  • Mount Mechanism (Jaguar) controllers on side board
  • Count up I/O and determine number of side cars necessary