2009:Electrical Main 2.7.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
m (Electrical Main 2.7.09 moved to 2009:Electrical Main 2.7.09) |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
2.7.09 | 2.7.09 | ||
Start time: | Start time: 9am | ||
End time: | End time:10pm | ||
Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell) [[Image:Shell-logo.gif]]<br> | Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell) [[Image:Shell-logo.gif]]<br> | ||
Line 9: | Line 9: | ||
<br> | <br> | ||
'''<u>Tasks Completed:</u>'''<br> | '''<u>Tasks Completed:</u>'''<br> | ||
*Finished soldering and wiring a mouse | *Finished soldering and wiring a mouse | ||
*Mounted mouse on robot | *Mounted mouse on robot<br> | ||
*Started second mouse | *Started second mouse | ||
*Battery box is completed and made and painted! | *Battery box is completed and made and painted! | ||
*Cut/prepped wires for final design | *Cut/prepped wires for final design | ||
*Wires BaneBot motors and Window | *Wires BaneBot motors and Window motor | ||
*Completed on-board power wires | |||
*Completed all lengths of Controller->Motor wires | |||
<br> | <br> | ||
Line 22: | Line 24: | ||
<u>'''Goals:'''</u> | <u>'''Goals:'''</u> | ||
= '''PLEASE VIEW MASTER TASK LIST FOR PRIORITY!'''<u>'''<br>'''</u> = | |||
<span style="color: rgb(153, 153, 153);">-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge | |||
</span> | |||
- | <span style="color: rgb(153, 153, 153);">-Finish up as many pwm cables as possible | ||
</span> | |||
- | <span style="color: rgb(153, 153, 153);">-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet? | ||
</span> | |||
- | <span style="color: rgb(153, 153, 153);">-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.</span><br> | ||
<br> | <br> |
Latest revision as of 13:38, 14 November 2010
2.7.09
Start time: 9am
End time:10pm
Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell)
Tasks Completed:
- Finished soldering and wiring a mouse
- Mounted mouse on robot
- Started second mouse
- Battery box is completed and made and painted!
- Cut/prepped wires for final design
- Wires BaneBot motors and Window motor
- Completed on-board power wires
- Completed all lengths of Controller->Motor wires
Goals:
PLEASE VIEW MASTER TASK LIST FOR PRIORITY!
-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge
-Finish up as many pwm cables as possible
-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?
-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.