2009:Electrical Main 2.9.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
m (Electrical Main 2.9.09 moved to 2009:Electrical Main 2.9.09) |
(No difference)
|
Latest revision as of 13:38, 14 November 2010
Start time: 6pm
End time: 9:30pm
Member's present: Crystal, Apples, Oranges, Karen
Night's summary:
- Crystal & Dave S. drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on. Board is bolted on robot.
- Dave B. & Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
- we had some of the yummy cake Crystal brought.