2009:Mechanical 2 1.7.2009: Difference between revisions
m (Mechanical 1.7.2009 moved to Mechanical 2 1.7.2009: mechanical 2 team) |
m (Mechanical 2 1.7.2009 moved to 2009:Mechanical 2 1.7.2009) |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
1.07.2009 | |||
'''Start Time:''' | |||
'''End Time:''' | |||
'''Members Present: ''' | |||
'''Tasks completed:''' <br>- Worked with Drive Train to conclude to determine the spacing for collection.<br> | '''Tasks completed:''' <br>- Worked with Drive Train to conclude to determine the spacing for collection.<br> | ||
Line 7: | Line 15: | ||
'''Tasks to complete:'''<br> | '''Tasks to complete:'''<br> | ||
-Finish available space analysis<br> | -Finish available space analysis<br> | ||
---- | |||
[[Mechanical_2|Mechanical 2 Main Page]] |
Latest revision as of 13:38, 14 November 2010
1.07.2009
Start Time:
End Time:
Members Present:
Tasks completed:
- Worked with Drive Train to conclude to determine the spacing for collection.
- Changed design of the robot created last night. It consists now of 2 rollers, the front roller bringing in balls into a 1x2 hopper (holds about 16 balls). There is a conveyor system in the front which brings the balls up to a top where we were talking about having a curved deflector plate and have the conveyor belts shoot the balls. We haven't excluded the idea of the roller kicking the balls out the front.
- Started inventor work with simple shapes that take up the space they represent to better understand the layout of available space.
Tasks to complete:
-Finish available space analysis