2009:Mechanical 2 - 1.11.09: Difference between revisions
Mechanical2 (talk | contribs) No edit summary |
Mechanical2 (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
'''Start time:10:00 am '''<br> | '''Start time:10:00 am '''<br> | ||
'''End time: | '''End time: 4:00 pm '''<br> | ||
'''Members present: Cuyler ( Cuyler had to leave @ 3:30 ), Kyle Schuhart'''<br> | '''Members present: Cuyler ( Cuyler came in at noon and had to leave @ 3:30 ), Kyle Schuhart ( Kyle has to leave at 4)'''<br> | ||
---- | ---- |
Revision as of 12:25, 11 January 2009
01.11.2009
Start time:10:00 am
End time: 4:00 pm
Members present: Cuyler ( Cuyler came in at noon and had to leave @ 3:30 ), Kyle Schuhart ( Kyle has to leave at 4)
Tasks Completed:
- Confirmation of motors
- Finished Drive Train (inventor braces that were not in original inventor file)
Tasks In Progress:
- Frame work
Tasks to Complete:
- Finish Frame work
- Place electrical board in inventor file
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Mechanical 2 update,
We have chosen what motors we are using for each mechanism,
For the Hopper: The trapdoor and lower collection blocker will be powered by a denso window motor(part #: 262100-3040)
For the ball conveyor we will be using two Rs-545 Banebots Motors with 25:1 reduction gearboxes
And for the Upper ball ejector we will be using the Fischer Price Motor (part #: 00968-2910) along with an AndyMark 67:1 gearbox