2011:Drivetrain 1.16: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance = '''Start time: ''' '''End time: ''' '''Members present: ''' '''Members Attending Next Meeting: ''' = Tasks Completed = *task **sub-task **sub-task *task = Tasks In Pr...)
 
No edit summary
Line 1: Line 1:
= Attendance =
= Attendance =


'''Start time: '''
'''Start time: 10:00'''  


'''End time: '''
'''End time: '''  


'''Members present: '''
'''Members present: Mo,Matt, Ben'''  


'''Members Attending Next Meeting: '''
'''Members Attending Next Meeting: Same?'''  


= Tasks Completed =
= Tasks Completed =


*task
*Fabricated 16 corner brackets for chassis
**sub-task
*Cut 3/4" Plywood boards for front and rear bumpers<br>
**sub-task
*Gathered bumper mounting hardware<br>
*task
*Made 1/2 in round spacers for mounting transmission plus extras<br>
*Worked on CAD design<br>


= Tasks In Progress =  
= Tasks In Progress =


*task
*CAD Design
**sub-task
*Need 3/4" plywood by 5" by 37 1/4" for side bumpers , need 2 pieces
**sub-task
*Purchase 3/8 16 t-nuts to have as spares
*task
*Drill holes in corner brackets
*Cut front and read aluminum channels - need to field check exact length between 27 and 27 1/4.


= Tasks to Complete =
= Tasks to Complete =


*task
*Assemble 4 omni wheels and hubs and sprockets
**sub-task
*Assemble traction wheels with hubs and sprockets
**sub-task
*Check to make sure we have epoxy or Gorilla glue.
*task
*For traction wheels, method is rivet one end first, do trial fit, stretch, roll around, a couple of times.&nbsp; Get length cut.
 
*glue, and wrap tread, drill the two remaining rivet holes.&nbsp; Make sure tread is seated all around.
= Materials Needed =
*Determine where to mount bumpers either through frame rail channels or make brackets?
 
*Need to buy bolts for bumpers, if we go through frame rail it will be 3/8" -16 x 2.5
*task
**sub-task
**sub-task
*task

Revision as of 19:36, 16 January 2011

Attendance

Start time: 10:00

End time: 

Members present: Mo,Matt, Ben

Members Attending Next Meeting: Same?

Tasks Completed

  • Fabricated 16 corner brackets for chassis
  • Cut 3/4" Plywood boards for front and rear bumpers
  • Gathered bumper mounting hardware
  • Made 1/2 in round spacers for mounting transmission plus extras
  • Worked on CAD design

Tasks In Progress

  • CAD Design
  • Need 3/4" plywood by 5" by 37 1/4" for side bumpers , need 2 pieces
  • Purchase 3/8 16 t-nuts to have as spares
  • Drill holes in corner brackets
  • Cut front and read aluminum channels - need to field check exact length between 27 and 27 1/4.

Tasks to Complete

  • Assemble 4 omni wheels and hubs and sprockets
  • Assemble traction wheels with hubs and sprockets
  • Check to make sure we have epoxy or Gorilla glue.
  • For traction wheels, method is rivet one end first, do trial fit, stretch, roll around, a couple of times.  Get length cut.
  • glue, and wrap tread, drill the two remaining rivet holes.  Make sure tread is seated all around.
  • Determine where to mount bumpers either through frame rail channels or make brackets?
  • Need to buy bolts for bumpers, if we go through frame rail it will be 3/8" -16 x 2.5