2011:Field 1/11/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...)
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Members present:  
Members present: Jason, Shayna, Kieran, Manuel
 
Mentors Present: Amy,


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  


<br>


<br>


 
----
 
--------------------------------------------------------------------------------


Tasks Completed:  
Tasks Completed:  


Task 1 -  
Task 1 - Calculations completed&nbsp;to determine&nbsp;gaffers tape required for field.


Task 2 -
Task 2 - Shopping List Constructed.


Task 3 - Reviewed new player station walls.


<br>


--------------------------------------------------------------------------------  
----


Tasks In Progress:  
Tasks In Progress:  


Task 1 -  
Task 1 - Shop for materials.
 
Task 2 -


<br>--------------------------------------------------------------------------------  
Task 2 - <br>--------------------------------------------------------------------------------  


Tasks to Complete:  
Tasks to Complete:  


Task 1 -  
Task 1 - Order Tape.
 
Task 2 -
 


Task 2 - Determine reflective tape part number&nbsp;and who we can buy it from.


<br>


<br>


--------------------------------------------------------------------------------  
----


Materials Needed:  
Materials Needed:  
Line 43: Line 45:
<br>Item 1 -  
<br>Item 1 -  


Item 2 -
Item 2 -  


--------------------------------------------------------------------------------  
----


Images &amp; Additional Updates:  
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Latest revision as of 05:56, 17 January 2011

Members present: Jason, Shayna, Kieran, Manuel

Mentors Present: Amy,


Members Attending Next Meeting:




Tasks Completed:

Task 1 - Calculations completed to determine gaffers tape required for field.

Task 2 - Shopping List Constructed.

Task 3 - Reviewed new player station walls.



Tasks In Progress:

Task 1 - Shop for materials.

Task 2 -
--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Order Tape.

Task 2 - Determine reflective tape part number and who we can buy it from.




Materials Needed:


Item 1 -

Item 2 -


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)