2011:Field 1/18/2011: Difference between revisions
FieldCrate (talk | contribs) (New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...) |
FieldCrate (talk | contribs) No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
Members present: | Members present: Jason, Shayna, Manuel, Keiran | ||
Mentors present: Amy, Lloyd | |||
<br>Members Attending Next Meeting: | <br>Members Attending Next Meeting: | ||
<br> | |||
<br> | |||
---- | |||
Tasks Completed: | Tasks Completed: | ||
Task 1 - | Task 1 - 2x4's cut for player station walls. | ||
Task 2 - 12in disk for stopper plates cut. | |||
<br> | |||
---- | |||
Tasks In Progress: | Tasks In Progress: | ||
Task 1 - | Task 1 - Assemble 3 more tower assemblies. | ||
Task 2 - | Task 2 - | ||
Line 29: | Line 31: | ||
Tasks to Complete: | Tasks to Complete: | ||
Task 1 - | Task 1 - Assemble 4 stop plates for tower assemblies. | ||
Task 2 - | Task 2 - Screw plates to pegs. | ||
Task 3 - Determine reflective tape part number and who we can buy it from. <br>Task 4- Cut pieces for player stations table. | |||
Task 5 - Paint player station walls. | |||
Task 6 - Paint field elements. | |||
<br> | |||
<br> | |||
---- | |||
Materials Needed: | |||
<br>Item 1 - Field tape. | |||
Item 2 - Game pieces. | |||
Item 3 - Additional PVC. | |||
- | Item 4 - Reflective Tape. | ||
Item 5 - Hardware for player station walls, velcro. | |||
---- | |||
Images & Additional Updates: | Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) |
Latest revision as of 10:15, 19 January 2011
Members present: Jason, Shayna, Manuel, Keiran
Mentors present: Amy, Lloyd
Members Attending Next Meeting:
Tasks Completed:
Task 1 - 2x4's cut for player station walls.
Task 2 - 12in disk for stopper plates cut.
Tasks In Progress:
Task 1 - Assemble 3 more tower assemblies.
Task 2 -
--------------------------------------------------------------------------------
Tasks to Complete:
Task 1 - Assemble 4 stop plates for tower assemblies.
Task 2 - Screw plates to pegs.
Task 3 - Determine reflective tape part number and who we can buy it from.
Task 4- Cut pieces for player stations table.
Task 5 - Paint player station walls.
Task 6 - Paint field elements.
Materials Needed:
Item 1 - Field tape.
Item 2 - Game pieces.
Item 3 - Additional PVC.
Item 4 - Reflective Tape.
Item 5 - Hardware for player station walls, velcro.
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)