2011:Electrical Main 1.22: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 11: Line 11:
= Tasks Completed  =
= Tasks Completed  =


*New mock design of control board in inventer<br>
*New mock design of control board in inventer<br>  
*Want-It/Got-It Light designs<br>
*[[Image:ControlBoardV2.jpg]][[Image:ControlBoardV2b.jpg]]
*Want-It/Got-It Light designs<br>  
**[http://www.ledlightsworld.com/side-view-flexible-led-light-strip-18-leds-p-133.html LED Strips], $8.35 per foot, one foot 2 rows 1.9" outer Diameter Pipe
**[[Image:Light_Tower.jpg]]
*Encoder Searching
*Encoder Searching



Latest revision as of 15:36, 22 January 2011

Attendance

Start time: 10:00

End time: 6:00

Members present: Henry, Dean

Members Attending Next Meeting:

Tasks Completed

  • New mock design of control board in inventer
  • ControlBoardV2.jpgControlBoardV2b.jpg
  • Want-It/Got-It Light designs
    • LED Strips, $8.35 per foot, one foot 2 rows 1.9" outer Diameter Pipe
    • Light Tower.jpg
  • Encoder Searching


Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • Twin Wall Plastic for Control Board Strength Testing