2011:Controls 1.23: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 29: Line 29:
**sub-task  
**sub-task  
**sub-task  
**sub-task  
*task-
*task - awaiting arrival ordered materials
*task - figure out eletrical connections and boards for internal section of controls


= Materials Needed  =
= Materials Needed  =

Revision as of 13:11, 23 January 2011

Attendance

Start time: 11AM

End time:

Members present: Crystal, Eric, Gafei, J.P

Members Attending Next Meeting:

Tasks Completed

  • task - we devised the control layout in the inventor program composed of three seperate sections:
  • the primary controls, two logitech joysticks on the left hand section, the classmate in the middle section, and the three indicator buttons and joystick, and throttle for the secondary controls on the right hand section
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task - creating a working program for the classmate 
    • sub-task
    • sub-task
  • task - determining placemate and measurments of controls in the interface

Tasks to Complete

  • task - we need to construct a functional prototype for the control interface before constructing the actual controls 
    • sub-task
    • sub-task
  • task - awaiting arrival ordered materials
  • task - figure out eletrical connections and boards for internal section of controls

Materials Needed

  • task
    • sub-task
    • sub-task
  • task