2009:Drivetrain 1.11.2009: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
01.11.2009  
01.11.2009  


'''Start time: '''10:30am
'''Start time: '''10:30am  


'''End time: '''<br>  
'''End time: '''<br>  


'''Members present: '''Crystal, Rika, Shauna, Larry<br>  
'''Members present: '''Crystal, Rika, Shauna, Mark, Larry<br>  


----
----
Line 12: Line 12:


*Assembled wheels on chassis<br>  
*Assembled wheels on chassis<br>  
*Tested and mounted optical encoders
*Tested and mounted optical encoders  
*Assembled transmissions on chassis
*Assembled transmissions on chassis  
*Electrical Boaaaaard


<br>  
<br>  

Revision as of 04:52, 12 January 2009

01.11.2009

Start time: 10:30am

End time:

Members present: Crystal, Rika, Shauna, Mark, Larry


Tasks Completed:

  • Assembled wheels on chassis
  • Tested and mounted optical encoders
  • Assembled transmissions on chassis
  • Electrical Boaaaaard



Tasks In Progress:

  • task
  • task



Tasks to Complete:

  • task
  • task



Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)



Drivetrain Main Page