2011:Controls 1.30: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 22: | Line 22: | ||
= Tasks to Complete = | = Tasks to Complete = | ||
*Send in the sheetmetal design for the BOX. :D | *Send in the sheetmetal design for the BOX. :D | ||
*<span style="color: rgb(255, 0, 255);" />'''<span style="color: rgb(255, 0, 255);">Add lightining bolt holes!</span>''' | |||
= Materials Needed = | = Materials Needed = | ||
*Preset buttons (being ordered) | *Preset buttons (being ordered) |
Revision as of 12:41, 30 January 2011
Attendance
Start time:11am
End time:No idea.
Members present:Rachel, Crystal, Eric, Gafei, Quinten
Members Attending Next Meeting:Rachel, Quiten, Crystal, Eric, GafeiGASPEI
Tasks Completed
- Completed the sketch for Inventor on the controls.... YAY RACHEL!
- [Insert image here]
- [Insert image here]
- Determined that Saitek will be on right (aka right hand use) and preset buttons / toggles / switches will be on
Tasks In Progress
- Order more buttons for the preset keys
- Determin how to protect the classmate pre/post-match
Tasks to Complete
- Send in the sheetmetal design for the BOX. :D
- Add lightining bolt holes!
Materials Needed
- Preset buttons (being ordered)