2011:Controls 1.30: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
'''Members Attending Next Meeting:Rachel, Quiten, Crystal, Eric, '''<strike>'''Gafei'''</strike>'''GASPEI''' | '''Members Attending Next Meeting:Rachel, Quiten, Crystal, Eric, '''<strike>'''Gafei'''</strike>'''GASPEI''' | ||
= Tasks Completed = | = Tasks Completed = | ||
*Completed the sketch for Inventor on the controls.... YAY RACHEL!<br> | *Completed the sketch for Inventor on the controls.... YAY RACHEL!<br> | ||
**[ | **[[Image:Final Layout.jpg]]<br> | ||
**[[Image:Final_Design_Lay_out_with_Dimensions.jpg]] | |||
*Determined that Saitek will be on right (aka right hand use) and preset buttons / toggles / switches will be on <br> | *Determined that Saitek will be on right (aka right hand use) and preset buttons / toggles / switches will be on <br> | ||
Line 23: | Line 24: | ||
*Send in the sheetmetal design for the BOX. :D | *Send in the sheetmetal design for the BOX. :D | ||
* | *'''<span style="color: rgb(255, 0, 255);">Add lightning bolt holes!</span>''' | ||
= Materials Needed = | = Materials Needed = | ||
*Preset buttons (being ordered) | *Preset buttons (being ordered) |
Latest revision as of 15:34, 30 January 2011
Attendance
Start time:11am
End time:No idea.
Members present:Rachel, Crystal, Eric, Gafei, Quinten
Members Attending Next Meeting:Rachel, Quiten, Crystal, Eric, GafeiGASPEI
Tasks Completed
- Completed the sketch for Inventor on the controls.... YAY RACHEL!
- Determined that Saitek will be on right (aka right hand use) and preset buttons / toggles / switches will be on
Tasks In Progress
- Order more buttons for the preset keys
- Determin how to protect the classmate pre/post-match
Tasks to Complete
- Send in the sheetmetal design for the BOX. :D
- Add lightning bolt holes!
Materials Needed
- Preset buttons (being ordered)