2011:2/1/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 9: Line 9:
<br> '''Minibot/Deployer'''  
<br> '''Minibot/Deployer'''  


Changed from the big air spring to three smaller dampeners: slide tubing will now be 1" x 1" x 1/16", small air springs will sit inside the 1" x 1" tubes, and that will replace the surgical tubing for extending the slide.  
Changed from the big air spring to three smaller dampeners: slide tubing will now be 1" x 1" x 1/16", small air springs will sit inside the 1" x 1" tubes, and that will replace the surgical tubing for extending the slide. Will lay this out in CAD tonight, then work on the tusks.  


<br>'''Electrical Main'''  
<br>'''Electrical Main'''  


The<br>  
<br>  


<br>'''Electrical Controls'''  
<br>'''Electrical Controls'''  


The<br>  
<br>  


<br>'''Programming'''  
<br>'''Programming'''  


The<br>
<br>

Revision as of 16:09, 1 February 2011

Drivetrain

Drivetrain is complete. Spacers for sprockets are here and need to be put on.


Arm/Manipulator

All the arm parts and most of the tower parts are out for manufacture. Somewhere between 1 and 20 small details need to be figured out for manufacture, but those should be done soon. Mounting points for deployer need to be integrated.


Minibot/Deployer

Changed from the big air spring to three smaller dampeners: slide tubing will now be 1" x 1" x 1/16", small air springs will sit inside the 1" x 1" tubes, and that will replace the surgical tubing for extending the slide. Will lay this out in CAD tonight, then work on the tusks.


Electrical Main



Electrical Controls



Programming