2011:Drivetrain 2.1: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance = '''Start time: ''' '''End time: ''' '''Members present: ''' '''Members Attending Next Meeting: ''' = Tasks Completed = *task **sub-task **sub-task *task = Tasks In Pr...) |
Mechanical1 (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
'''Start time: ''' | '''Start time:''' | ||
'''End time: ''' | '''End time:''' | ||
'''Members present: ''' | '''Members present:''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting:''' | ||
= Tasks Completed = | = Tasks Completed = | ||
* | *Drive train is complete with wheels, spacers and chain tensioned. 3/4" wood cut for bumpers. Front and rear pieces cut 5" high by 28.5", side pieces cut 5" high by 37". Mounting points are in the center of the channel frame 3/8" dia holes. Bottom edge of the wood is 1.375" off the floor. | ||
** | **Using oversize channel (1.25" ID) sections as capture the frame channel and act as washers. These sections stay with the bumpers and add no weight to the robot. | ||
**sub-task | **sub-task | ||
*task | *task | ||
= Tasks In Progress = | = Tasks In Progress = | ||
*task | *task | ||
**sub-task | **sub-task | ||
**sub-task | **sub-task | ||
*task | *task | ||
= Tasks to Complete = | = Tasks to Complete = | ||
* | *anchor the "T" nuts in the wood and glue the pool noodles | ||
** | **Front and rear have not been drilled waiting for final arm achcor points to be determined | ||
**sub-task | **sub-task | ||
*task | *task | ||
= Materials Needed = | = Materials Needed = | ||
*task | *task | ||
**sub-task | **sub-task | ||
**sub-task | **sub-task | ||
*task | *task |
Latest revision as of 18:40, 1 February 2011
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- Drive train is complete with wheels, spacers and chain tensioned. 3/4" wood cut for bumpers. Front and rear pieces cut 5" high by 28.5", side pieces cut 5" high by 37". Mounting points are in the center of the channel frame 3/8" dia holes. Bottom edge of the wood is 1.375" off the floor.
- Using oversize channel (1.25" ID) sections as capture the frame channel and act as washers. These sections stay with the bumpers and add no weight to the robot.
- sub-task
- task
Tasks In Progress
- task
- sub-task
- sub-task
- task
Tasks to Complete
- anchor the "T" nuts in the wood and glue the pool noodles
- Front and rear have not been drilled waiting for final arm achcor points to be determined
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task