2011:Mechanical 2 2.6: Difference between revisions
(New page: = Attendance = '''Start time: ''' '''End time: ''' '''Members present: ''' '''Members Attending Next Meeting: ''' = Tasks Completed = *task **sub-task **sub-task *task = Tasks In Pr...) |
Mechanical2 (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
'''Start time: ''' | '''Start time: ''' | ||
'''End time: ''' | '''End time: ''' | ||
'''Members present: ''' | '''Members present: ''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting: ''' | ||
= Tasks Completed = | = Tasks Completed = | ||
*task | |||
**sub-task | |||
**sub-task | |||
*task | *task | ||
= Tasks In Progress = | = Tasks In Progress = | ||
- Do we have a sprocket guard figured out yet for the top of the arm?<br>- Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.<br>5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!! | |||
- We don’t have a final design for the tusks or how they will be deployed yet.7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots? | |||
- Deployer park side side shield A ALEX done<br>- Deployer park side side shield B ALEX done<br> - Drawbridge TOM<br>- Side electrical board supports, and place board CIANNA<br>- Belly pan | |||
1- sensor brackets and flags 3 | |||
- arm release trigger | |||
- parts inventory | |||
2- jack shaft details | |||
encoder on the jack shaft | |||
- ASSEMBLE | |||
- put in electrical components and weight cg work.CIANNA | |||
3- MINI BOT HOLDER | |||
4- Light tower mount. | |||
<br> | |||
= Tasks to Complete = | = Tasks to Complete = | ||
*task | *task | ||
**sub-task | **sub-task | ||
**sub-task | **sub-task | ||
*task | *task | ||
= Materials Needed = | = Materials Needed = | ||
*task | *task | ||
**sub-task | **sub-task | ||
**sub-task | **sub-task | ||
*task | *task |
Revision as of 10:03, 6 February 2011
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- Do we have a sprocket guard figured out yet for the top of the arm?
- Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!
- We don’t have a final design for the tusks or how they will be deployed yet.7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?
- Deployer park side side shield A ALEX done
- Deployer park side side shield B ALEX done
- Drawbridge TOM
- Side electrical board supports, and place board CIANNA
- Belly pan
1- sensor brackets and flags 3
- arm release trigger
- parts inventory
2- jack shaft details
encoder on the jack shaft
- ASSEMBLE
- put in electrical components and weight cg work.CIANNA
3- MINI BOT HOLDER
4- Light tower mount.
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task