Line 20: Line 20:
- Do we have a sprocket guard figured out yet for the top of the arm?<br>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.<br>  
- Do we have a sprocket guard figured out yet for the top of the arm?<br>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.<br>  


'''- Deployer park side side shield A, ALEX&nbsp; needs drawing<br>- Deployer park side side shield B, ALEX needs drawing'''<br> - Draw bridge TOM / Alex<br>  
'''- Deployer park side side shield A, ALEX&nbsp; needs drawing<br>- Deployer park side side shield B, ALEX needs drawing'''<br> '''- Draw bridge TOM / Alex'''<br>  


&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Draw bridge deploy<br>- Side electrical board supports, and place board CIANNA<br>- Belly pan  
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Draw bridge deploy<br>- Side electrical board supports, and place board CIANNA<br>- Belly pan  
Line 38: Line 38:
- put in electrical components and weight cg work.CIANNA  
- put in electrical components and weight cg work.CIANNA  


3- MINI BOT HOLDER  
'''3- MINI BOT HOLDER'''


'''4- Light tower mount.&nbsp; Gabe'''  
'''4- Light tower mount.&nbsp; Gabe'''  

Revision as of 10:36, 6 February 2011

Attendance

Start time:

End time:

Members present:Brianna, Ciana, Alex, Mr Kanzler, Mr Wolf

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

- Do we have a sprocket guard figured out yet for the top of the arm?
         Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.

- Deployer park side side shield A, ALEX  needs drawing
- Deployer park side side shield B, ALEX needs drawing

- Draw bridge TOM / Alex

      Draw bridge deploy
- Side electrical board supports, and place board CIANNA
- Belly pan

1- sensor brackets and flags 3 Brianna

- arm release trigger

- parts inventory

2- jack shaft details

       encoder on the jack shaft

- ASSEMBLE

- put in electrical components and weight cg work.CIANNA

3- MINI BOT HOLDER

4- Light tower mount.  Gabe

- Deploy side deployer mount, sheet metal



Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task