2011:Electrical Main 2.6: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
*Dave B further organized electrical parts - we got some more plastic bins <span id="fck_dom_range_temp_1297083394867_124" />to aid this | *Dave B further organized electrical parts - we got some more plastic bins <span id="fck_dom_range_temp_1297083394867_124" />to aid this | ||
= Tasks In Progress = | = Tasks In Progress = | ||
* | *Figure out cable routing | ||
** | **we believe we have a plan for routing wires around arm hinge out near the maipulator - take them around the side. | ||
** | ** still need a plan for routing wires up into the arm at the main pivot point. | ||
*task | *task | ||
Revision as of 05:58, 7 February 2011
Attendance
Start time: 10:30
End time:
Members present: Matthieu D, Christian S, Manuel S., Vaughn, Dave B, Dave S
Members Attending Next Meeting:
Tasks Completed
- Signal Light completely built, wired and tested - ready for mounting on robot
- inventoried wire for the robot - we have the gauges and colors we need
- Dave B further organized electrical parts - we got some more plastic bins to aid this
Tasks In Progress
- Figure out cable routing
- we believe we have a plan for routing wires around arm hinge out near the maipulator - take them around the side.
- still need a plan for routing wires up into the arm at the main pivot point.
- task
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task