2011:Electrical Main 2.6: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 17: Line 17:
= Tasks In Progress  =
= Tasks In Progress  =


*Figure out cable routing
*Figure out cable routing  
**we believe we have a plan for routing wires around arm hinge out near the maipulator - take them around the side.
**we believe we have a plan for routing wires around arm hinge out near the manipulator - take them around the side.  
** still need a plan for routing wires up into the arm at the main pivot point.
**still need a plan for routing wires up into the arm at the main pivot point.
*task
*task



Revision as of 04:58, 7 February 2011

Attendance

Start time: 10:30

End time:

Members present: Matthieu D, Christian S, Manuel S., Vaughn, Dave B, Dave S

Members Attending Next Meeting:

Tasks Completed

  • Signal Light completely built, wired and tested - ready for mounting on robot
  • inventoried wire for the robot - we have the gauges and colors we need
  • Dave B further organized electrical parts - we got some more plastic bins to aid this

Tasks In Progress

  • Figure out cable routing
    • we believe we have a plan for routing wires around arm hinge out near the manipulator - take them around the side.
    • still need a plan for routing wires up into the arm at the main pivot point.
  • task

Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task