= Attendance  =
= Attendance  =


'''Start time: 10:30'''
'''Start time: 10:30'''  


'''End time:'''
'''End time:''' 6:00


'''Members present: Matthieu D, Christian S, Manuel S., Vaughn, Dave B, Dave S'''
'''Members present: Matthieu D, Christian S, Manuel S., Vaughn, Dave B, Dave S'''  


'''Members Attending Next Meeting:'''
'''Members Attending Next Meeting:'''
Line 11: Line 11:
= Tasks Completed  =
= Tasks Completed  =


*Signal Light completely built, wired and tested - ready for mounting on robot
*Signal Light completely built, wired and tested - ready for mounting on robot  
*inventoried wire for the robot - we have the gauges and colors we need
*inventoried wire for the robot - we have the gauges and colors we need  
*Dave B further organized electrical parts - we got some more plastic bins <span id="fck_dom_range_temp_1297083394867_124" />to aid this
*Dave B further organized electrical parts - we got some more plastic bins to aid this


= Tasks In Progress  =
= Tasks In Progress  =


*Figure out cable routing
*Figure out cable routing  
**we believe we have a plan for routing wires around arm hinge out near the maipulator - take them around the side.
**we believe we have a plan for routing wires around arm hinge out near the manipulator - take them around the side.  
** still need a plan for routing wires up into the arm at the main pivot point.
**still need a plan for routing wires up into the arm at the main pivot point.
*task
*task


= Tasks to Complete =
= Tasks to Complete =


*task
*mount main electrical board on robot and assemble/wire
**sub-task
*need to cut to size the side electrical board
**sub-task
*task


= Materials Needed =
= Materials Needed =

Latest revision as of 05:00, 7 February 2011

Attendance

Start time: 10:30

End time: 6:00

Members present: Matthieu D, Christian S, Manuel S., Vaughn, Dave B, Dave S

Members Attending Next Meeting:

Tasks Completed

  • Signal Light completely built, wired and tested - ready for mounting on robot
  • inventoried wire for the robot - we have the gauges and colors we need
  • Dave B further organized electrical parts - we got some more plastic bins to aid this

Tasks In Progress

  • Figure out cable routing
    • we believe we have a plan for routing wires around arm hinge out near the manipulator - take them around the side.
    • still need a plan for routing wires up into the arm at the main pivot point.
  • task

Tasks to Complete

  • mount main electrical board on robot and assemble/wire
  • need to cut to size the side electrical board

Materials Needed

  • task
    • sub-task