2011:Mechanical 2 2.12: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance = '''Start time: ''' '''End time: ''' '''Members present: ''' '''Members Attending Next Meeting: ''' = Tasks Completed = *task **sub-task **sub-task *task = Tasks In Pr...) |
Mechanical2 (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= Attendance = | = Attendance :D<br> = | ||
'''Start time: ''' | '''Start time:10''' | ||
'''End time: ''' | '''End time:10:30''' | ||
'''Members present: ''' | '''Members present:Alex W, brianna m, ciana r, jake k, ethan m, jon g, mr w. mr k.''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting: ''' | ||
= Tasks Completed = | = Tasks Completed = | ||
* | *manioulator completly assembled | ||
* | *arm assembled<br> | ||
= Tasks In Progress = | = Tasks In Progress = | ||
*filing down latch to make it fit right<br> | |||
**sub-task | |||
**sub-task | |||
*task | *task | ||
= Tasks to Complete = | = Tasks to Complete = | ||
Arm Tasks | |||
* | *Arm Shaft Machining '''IN-PROCESS'''<br> Drawing completed (Alex W) '''COMPLETED'''<br> * Fabricate Arm/Sprocket Mounting Angles '''COMPLETED'''<br> * Arm Hinge Shaft machining '''COMPLETED'''<br> Drawings complete (TDK) '''COMPLETED'''<br> * Buy or find E-Rings * '''PENDING'''<br> * Layout and Drill Arm Extensions '''COMPLETED'''<br> <strike>Partially complete (Jonathan, Manuel)</strike><br> * Assemble Latches and Springs<br> Partially complete (Manuel)<br> Find or make plastic spacers<br> * Buy #8 button head screws *<br> * Machine chamfer into Big Sprocket (Tony D)'''IN-PROCESS'''<br> * Bore lightening holes in 66T sprocket '''ON HOLD'''<br> <strike>Need drawing</strike><br> * Mill Arm Slots '''COMPLETED'''<br> <strike>In-process (Alex W)</strike><br> * Deburr Arm Holes '''COMPLETED'''<br> <strike>Completed (Lizzy)</strike><br> * Drill and Tap AndyMark Hub for Arm<br> Drawing Required<br> * Assemble AndyMark Hub to Arm | ||
** | |||
** | |||
* | |||
= Materials Needed = | = Materials Needed = | ||
* | *Button Head Screws | ||
** | **8 x 3/4 long (12 ea) | ||
** | **10 x 1/2 long (12 ea) | ||
*task | *task |
Latest revision as of 20:13, 12 February 2011
Attendance :D
Start time:10
End time:10:30
Members present:Alex W, brianna m, ciana r, jake k, ethan m, jon g, mr w. mr k.
Members Attending Next Meeting:
Tasks Completed
- manioulator completly assembled
- arm assembled
Tasks In Progress
- filing down latch to make it fit right
- sub-task
- sub-task
- task
Tasks to Complete
Arm Tasks
- Arm Shaft Machining IN-PROCESS
Drawing completed (Alex W) COMPLETED
* Fabricate Arm/Sprocket Mounting Angles COMPLETED
* Arm Hinge Shaft machining COMPLETED
Drawings complete (TDK) COMPLETED
* Buy or find E-Rings * PENDING
* Layout and Drill Arm Extensions COMPLETED
Partially complete (Jonathan, Manuel)
* Assemble Latches and Springs
Partially complete (Manuel)
Find or make plastic spacers
* Buy #8 button head screws *
* Machine chamfer into Big Sprocket (Tony D)IN-PROCESS
* Bore lightening holes in 66T sprocket ON HOLD
Need drawing
* Mill Arm Slots COMPLETED
In-process (Alex W)
* Deburr Arm Holes COMPLETED
Completed (Lizzy)
* Drill and Tap AndyMark Hub for Arm
Drawing Required
* Assemble AndyMark Hub to Arm
Materials Needed
- Button Head Screws
- 8 x 3/4 long (12 ea)
- 10 x 1/2 long (12 ea)
- task