2011:FieldMasterTaskList: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Leadership (talk | contribs) No edit summary |
Leadership (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
*<strike>Finish cutting PVC</strike> | *<strike>Finish cutting PVC</strike> | ||
*Glue remaining PVC sections together | *Glue remaining PVC sections together | ||
*<strike>Attach retention plates to PVC outriggers</strike> | *<strike>Attach retention plates to PVC outriggers</strike> | ||
*<strike>Finish cutting tower base supports</strike> | *<strike>Finish cutting tower base supports</strike> | ||
*<strike>Assemble 3 remaining tower bases</strike> | *<strike>Assemble 3 remaining tower bases</strike> | ||
*Cut out the hole in the 1 remaining floor protector | *<strike>Cut out the hole in the 1 remaining floor protector</strike> | ||
*<strike>Order game pieces </strike> | *<strike>Order game pieces </strike> | ||
**<strike>14 Red Triangle</strike> | **<strike>14 Red Triangle</strike> | ||
Line 12: | Line 12: | ||
**<strike>14 White Circle</strike> | **<strike>14 White Circle</strike> | ||
**<strike>8 Yellow Ubertube</strike> | **<strike>8 Yellow Ubertube</strike> | ||
*<strike>Cut Scrap Pieces of carpet to cover the floor protectors</strike> | *<strike>Cut Scrap Pieces of carpet to cover the floor protectors</strike> | ||
*Cut plywood pieces for the feeder slots in alliance walls | *<strike>Cut plywood pieces for the feeder slots in alliance walls</strike> | ||
<br> | <br> | ||
= Pre-Rally Items = | |||
*Drill holes for rail alignment | |||
*Mount post toppers | |||
*Mounting system on player stations for power/connectivity | |||
*Drill holes in each player station for cords | |||
*Drill 1 hole in each piece of Lexan for securing | |||
<br> | |||
= Alliance Station Walls = | = Alliance Station Walls = | ||
*<strike>Cut 2x4's to proper length </strike> | *<strike>Cut 2x4's to proper length </strike> | ||
**<strike>Wall Uprights</strike> | **<strike>Wall Uprights</strike> | ||
**<strike>Wall Cross Members</strike> | **<strike>Wall Cross Members</strike> | ||
**<strike>Player Station Legs</strike> | **<strike>Player Station Legs</strike> | ||
**<strike>Player Station Frames </strike> | **<strike>Player Station Frames </strike> | ||
*<strike>Cut plywood player station tops</strike> | *<strike>Cut plywood player station tops</strike> | ||
*<strike>Cut plywood corner brackets</strike> | *<strike>Cut plywood corner brackets</strike> | ||
*<strike>Assemble the sections of the new alliance station walls</strike> | *<strike>Assemble the sections of the new alliance station walls</strike> | ||
== Hardware Connections == | == Hardware Connections == | ||
*Pre-fit lexan panels | |||
*Pre-drill holes for connecting bolts | *<strike>Pre-fit lexan panels</strike> | ||
*Pre-fit player station assemblies | *<strike>Pre-drill holes for connecting bolts</strike> | ||
*Put together entire wall assembly prior to Rally | *<strike>Pre-fit player station assemblies</strike> | ||
*<strike>Put together entire wall assembly prior to Rally</strike> | |||
<br> | <br> | ||
= Painting = | = Painting = | ||
*<strike>Paint alliance station wall bottoms</strike> | *<strike>Paint alliance station wall bottoms</strike> | ||
*<strike>Paint alliance station wall frames</strike> | *<strike>Paint alliance station wall frames</strike> | ||
*<strike>Paint tower bases</strike> | *<strike>Paint tower bases</strike> | ||
*<strike>Paint lane dividers</strike> | *<strike>Paint lane dividers</strike> | ||
*<strike>Paint Player Station Legs and Frames</strike> | *<strike>Paint Player Station Legs and Frames</strike> | ||
<br> | <br> | ||
= Other Items = | = Other Items = | ||
*Design New Pit Set-up | *Design New Pit Set-up | ||
*Repair the damaged areas of the crate | *<strike>Repair the damaged areas of the crate</strike> | ||
*Set-up the cart for the 2011 robot | *<strike>Set-up the cart for the 2011 robot </strike> | ||
*Clean up scrap materials in the new closet | *Clean up scrap materials in the new closet | ||
*Organize the new closet | *Organize the new closet | ||
*Look into new ways to build field rails for Rally | *<strike>Look into new ways to build field rails for Rally</strike> |
Latest revision as of 21:50, 13 February 2011
2011 Game Elements
Finish cutting PVC- Glue remaining PVC sections together
Attach retention plates to PVC outriggersFinish cutting tower base supportsAssemble 3 remaining tower basesCut out the hole in the 1 remaining floor protectorOrder game pieces14 Red Triangle14 Blue Square14 White Circle8 Yellow Ubertube
Cut Scrap Pieces of carpet to cover the floor protectorsCut plywood pieces for the feeder slots in alliance walls
Pre-Rally Items
- Drill holes for rail alignment
- Mount post toppers
- Mounting system on player stations for power/connectivity
- Drill holes in each player station for cords
- Drill 1 hole in each piece of Lexan for securing
Alliance Station Walls
Cut 2x4's to proper lengthWall UprightsWall Cross MembersPlayer Station LegsPlayer Station Frames
Cut plywood player station topsCut plywood corner bracketsAssemble the sections of the new alliance station walls
Hardware Connections
Pre-fit lexan panelsPre-drill holes for connecting boltsPre-fit player station assembliesPut together entire wall assembly prior to Rally
Painting
Paint alliance station wall bottomsPaint alliance station wall framesPaint tower basesPaint lane dividersPaint Player Station Legs and Frames
Other Items
- Design New Pit Set-up
Repair the damaged areas of the crateSet-up the cart for the 2011 robot- Clean up scrap materials in the new closet
- Organize the new closet
Look into new ways to build field rails for Rally