2011:Mechanical 2 2.22: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 21: Line 21:
Before FLR  
Before FLR  


1 Order McmasterCarr parts  
1 Order spare parts from Harris


2 Order spare parts from Harris
2 Redesign manipulator wheel shafts for maintainability


3 Redesign manipulator wheel shafts for maintainability
3 Design chain guard


4 Design chain guard  
4 Design manipulator wheel guard 


5 Design manipulator wheel guard 
5 Design minibot roof and backstop


6 Design minibot roof and backstop
<br>
 
 
 
Complete;


Complete;


1 Order McmasterCarr parts <br>


= Materials Needed  =
= Materials Needed  =

Revision as of 09:13, 26 February 2011

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks to Complete

At FLR

1 Put bolts in the corners of the upper structure

2 Put on chain guard

3 Put on minibot roof

Before FLR

1 Order spare parts from Harris

2 Redesign manipulator wheel shafts for maintainability

3 Design chain guard

4 Design manipulator wheel guard 

5 Design minibot roof and backstop


Complete;

1 Order McmasterCarr parts

Materials Needed

  • task
    • sub-task
    • sub-task
  • task