2012:Drivetrain 01.15: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Drivetrain (talk | contribs) No edit summary |
Drivetrain (talk | contribs) No edit summary |
||
Line 23: | Line 23: | ||
* | * | ||
= Tasks to Complete = | = Tasks to Complete = | ||
* | *E(pic)-Bracket completion and manufacturing. | ||
*FINALIZE BALL DEFLECTOR | |||
* | |||
= Materials Needed = | = Materials Needed = | ||
*PROTRACTORS!!! | *PROTRACTORS!!! |
Revision as of 17:17, 15 January 2012
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- inventor drawings worked on.
- E(pic)-Bracket drawings/design finished
- wiki updated
Tasks In Progress
- Chassis work
- E- channels/braces
- wheel spacings
Tasks to Complete
- E(pic)-Bracket completion and manufacturing.
- FINALIZE BALL DEFLECTOR
Materials Needed
- PROTRACTORS!!!