2012:Controls 01.29: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
'''Start time: ''' | '''Start time: 10AM''' | ||
'''End time: ''' | '''End time: 8PM''' | ||
'''Members present: ''' | '''Members present: Justin, Eric, Alex, Shayna, Gafei ''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting:''' | ||
= Tasks Completed = | = Tasks Completed = | ||
* | *Created paper prototype of electrical controls | ||
* | *Completed excel list of electrical controls. | ||
= Tasks In Progress = | = Tasks In Progress = | ||
* | *Created preliminary connector pin out for the freedom tower interface. Analog interface is working through ADC. | ||
* | *Brainstorm android based HID interface for autonomous mode. | ||
= Tasks to Complete = | = Tasks to Complete = | ||
* | *FInish freedom tower programming interface | ||
= Materials Needed = | = Materials Needed = | ||
* | *BOM materials. | ||
Revision as of 16:27, 29 January 2012
Attendance
Start time: 10AM
End time: 8PM
Members present: Justin, Eric, Alex, Shayna, Gafei
Members Attending Next Meeting:
Tasks Completed
- Created paper prototype of electrical controls
- Completed excel list of electrical controls.
Tasks In Progress
- Created preliminary connector pin out for the freedom tower interface. Analog interface is working through ADC.
- Brainstorm android based HID interface for autonomous mode.
Tasks to Complete
- FInish freedom tower programming interface
Materials Needed
- BOM materials.