2013:Climber 01.27: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Attendance =
= Attendance =


'''Start time: '''
'''Start time:''' 10 am


'''End time: '''
'''End time:''' 8:30 pm


'''Members present: '''
'''Members present:''' Alex Wolf, Mr. Wolf, Josh, Brianna Mancine


'''Members Attending Next Meeting: '''
'''Members Attending Next Meeting:'''


= Tasks Completed =
= Tasks Completed =


*task
*here's the robot so far!
**sub-task
 
**sub-task
[[File:jan 27 2013.jpg]]
*task
 
*DONE- check 54 inch cyl
*DONE Alex- Design Black arm pivot
*DONE Alex- Put in battery
*DONE Alex -Add lightening holes all over the place
*Done-  Revise part #002 with "far side" note
*Done-  Redesign 002 elevator C chanel to accomodate "new" pyramid.
 
*SENT OUT A LOT OF PARTS


= Tasks In Progress =


*task
= Tasks In Progress =
**sub-task
 
**sub-task
*Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
*task
**put in shopping list


= Tasks to Complete =
= Tasks to Complete =


*task
*
**sub-task
Release all fab parts 1/24/13
**sub-task
 
*task
list and order all assembly hardware
 
DONE- check 54 inch cyl
 
DONE Alex- Design Black arm pivot
 
DONE Alex- Put in battery
 
Design release mechanism for red arms and black arms
 
Alex-   Design restraining mechanism for red arms and black arms
 
Brianna- Add sensors to model
 
Brianna- Design the cross member with leg guide for Red arms and Black arms
 
DONE Alex -Add lightening holes all over the place
 
Order all purchase parts
 
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline
 
Use cross members to strengthen the elevator shafts
 
Belay attachment points
 
Done-  Revise part #002 with "far side" note
 
Done-  Redesign 002 elevator C chanel to accomodate "new" pyramid.
 
Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
 
ON HOLD - transmission chain tentioner
 
 


= Materials Needed =
= Materials Needed =


*task
*see google list
**sub-task
**sub-task
*task

Latest revision as of 18:10, 27 January 2013

Attendance

Start time: 10 am

End time: 8:30 pm

Members present: Alex Wolf, Mr. Wolf, Josh, Brianna Mancine

Members Attending Next Meeting:

Tasks Completed

  • here's the robot so far!

Jan 27 2013.jpg

  • DONE- check 54 inch cyl
  • DONE Alex- Design Black arm pivot
  • DONE Alex- Put in battery
  • DONE Alex -Add lightening holes all over the place
  • Done-  Revise part #002 with "far side" note
  • Done-  Redesign 002 elevator C chanel to accomodate "new" pyramid.
  • SENT OUT A LOT OF PARTS


Tasks In Progress

  • Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
    • put in shopping list

Tasks to Complete

Release all fab parts 1/24/13

list and order all assembly hardware

DONE- check 54 inch cyl

DONE Alex- Design Black arm pivot

DONE Alex- Put in battery

Design release mechanism for red arms and black arms

Alex-   Design restraining mechanism for red arms and black arms

Brianna- Add sensors to model

Brianna- Design the cross member with leg guide for Red arms and Black arms

DONE Alex -Add lightening holes all over the place

Order all purchase parts

Combine all subteams parts and design the CG to be within +/- one inch from bot centerline

Use cross members to strengthen the elevator shafts

Belay attachment points

Done-  Revise part #002 with "far side" note

Done-  Redesign 002 elevator C chanel to accomodate "new" pyramid.

Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.

ON HOLD - transmission chain tentioner


Materials Needed

  • see google list