2009:Electrical Main 1.27.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: ---- 1.27.2009 '''Start time: '''6:30 '''End time: '''<br> '''Members present: '''Mike, Crystal, Rika, Apples, Oranges<br> ---- '''Tasks Completed:'''<br> *more updates to the B...)
 
No edit summary
Line 3: Line 3:
1.27.2009  
1.27.2009  


'''Start time: '''6:30
'''Start time: '''6:30  


'''End time: '''<br>  
'''End time: '''<br>  


'''Members present: '''Mike, Crystal, Rika, Apples, Oranges<br>  
'''Members present: '''Mike, Crystal, Rika, Collin, Apples, Oranges<br>  


----
----
Line 14: Line 14:


*more updates to the BOM<br>  
*more updates to the BOM<br>  
*Side electrical board is in main robot design in inventor
*Side electrical board is in main robot design in inventor  
*cut Lexan for side electrical board
*cut Lexan for side electrical board


Line 23: Line 23:
'''Tasks In Progress:'''<br>  
'''Tasks In Progress:'''<br>  


*design and fabricate battery box
*design and fabricate battery box  
*keep updating BOM
*keep updating BOM


Line 32: Line 32:
'''Tasks to Complete: '''<br>  
'''Tasks to Complete: '''<br>  


*measure and fabricate cRIO mounting plate
*measure and fabricate cRIO mounting plate  
*task
*task



Revision as of 16:45, 27 January 2009


1.27.2009

Start time: 6:30

End time:

Members present: Mike, Crystal, Rika, Collin, Apples, Oranges


Tasks Completed:

  • more updates to the BOM
  • Side electrical board is in main robot design in inventor
  • cut Lexan for side electrical board



Tasks In Progress:

  • design and fabricate battery box
  • keep updating BOM



Tasks to Complete:

  • measure and fabricate cRIO mounting plate
  • task