2009:Electrical Main 2.5.09: Difference between revisions
No edit summary |
m (Electrical Main 2.5.09 moved to 2009:Electrical Main 2.5.09) |
||
(7 intermediate revisions by one other user not shown) | |||
Line 33: | Line 33: | ||
6. Mouse Encoders - Mike and Crystal | 6. Mouse Encoders - Mike and Crystal | ||
7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean | 7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean | ||
<br> | |||
<u>'''Stuff in the Process'''</u> | |||
-Schope is looking for sketmatics for our banner sensors | |||
-Dave and Josh are working on measuring out wiring in inventor | |||
-Rika and Cuyler are collaborating about the battery box | |||
-Mike and Crystal will be in the shop working on the board, velcroing, prepping wires, ect. | |||
'''<u>Completed</u>''' | |||
-Crystal marked up the electrical board, placed down the Victor velcro, moved the Distribution block another inch up so 2" from bottom, moved the side car up and marked the wireless bridge again. | |||
-Banner Sensor Schematic (h/t Oranges and Sean) | |||
[[Image:BannerSensor.jpg|thumb|left|Banner Sensor (Cause It's Special)]] | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
-Initial Wiring Diagrams | |||
[[Image:WireDiag1.jpg|thumb|left|Mostly Mechanisms]][[Image:WireDiag2.jpg|thumb|left|Power Dist. and Drive]] | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
<br> | |||
[[Image:UpperSpinner.jpg|thumb|left|This is how the upper spinner is wired in.]] |
Latest revision as of 13:38, 14 November 2010
2.5.2009
Start time: 6:40pm
End time: 9pm
Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges
Burlone's Marching Orders of the Night:(¬O_o)¬
1. Battery Box - Rika/Cuyler
2. Remount Electrical (Saturday) -- Group
3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)
-PWM cabled will be used from kit, any other long lengths will be custom terminated.
Banner Sensor Configuration:
Put together a wiring harness and use 7100's as an example - Sillyscope
4. Continue velcroing the board -- Group
5. Create Battery strap - Rika
6. Mouse Encoders - Mike and Crystal
7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean
Stuff in the Process
-Schope is looking for sketmatics for our banner sensors
-Dave and Josh are working on measuring out wiring in inventor
-Rika and Cuyler are collaborating about the battery box
-Mike and Crystal will be in the shop working on the board, velcroing, prepping wires, ect.
Completed
-Crystal marked up the electrical board, placed down the Victor velcro, moved the Distribution block another inch up so 2" from bottom, moved the side car up and marked the wireless bridge again.
-Banner Sensor Schematic (h/t Oranges and Sean)
-Initial Wiring Diagrams