2009:Electrical Main 2.7.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
2.7.09  
2.7.09  


Start time: 11am
Start time: 9am


End time:  
End time:10pm


Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell) [[Image:Shell-logo.gif]]<br>  
Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell) [[Image:Shell-logo.gif]]<br>  
Line 9: Line 9:
<br>  
<br>  


'''<u>Tasks Completed:</u>'''<br>
'''<u>Tasks Completed:</u>'''<br>  


*Finished soldering and wiring a mouse  
*Finished soldering and wiring a mouse  
*Mounted mouse on robot (still trying to get it to work)
*Mounted mouse on robot<br>
*Started second mouse
*Started second mouse  
*Battery box is completed and made and painted!  
*Battery box is completed and made and painted!  
*Cut/prepped wires for final design  
*Cut/prepped wires for final design  
*Wires BaneBot motors and Window motors
*Wires BaneBot motors and Window motor
*Completed on-board power wires
*Completed all lengths of Controller-&gt;Motor wires


<br>  
<br>  
Line 22: Line 24:
<u>'''Goals:'''</u>  
<u>'''Goals:'''</u>  


-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge
= '''PLEASE VIEW MASTER&nbsp;TASK&nbsp;LIST&nbsp;FOR&nbsp;PRIORITY!'''<u>'''<br>'''</u> =


-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?
<span style="color: rgb(153, 153, 153);">-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge
</span>


-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?
<span style="color: rgb(153, 153, 153);">-Finish up as many pwm cables as possible
</span>


-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.
<span style="color: rgb(153, 153, 153);">-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?
</span>


-Figure out positioning of 120 Amp breaker - Near battery on the holder?
<span style="color: rgb(153, 153, 153);">-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.</span><br>


<br>  
<br>  

Latest revision as of 13:38, 14 November 2010

2.7.09

Start time: 9am

End time:10pm

Members present: Dave, Dave, Rika, Sean, Collin, Crystal, Michel (Me-shell) Shell-logo.gif


Tasks Completed:

  • Finished soldering and wiring a mouse
  • Mounted mouse on robot
  • Started second mouse
  • Battery box is completed and made and painted!
  • Cut/prepped wires for final design
  • Wires BaneBot motors and Window motor
  • Completed on-board power wires
  • Completed all lengths of Controller->Motor wires


Goals:

PLEASE VIEW MASTER TASK LIST FOR PRIORITY!

-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge

-Finish up as many pwm cables as possible

-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?

-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.



You guys are amazing keep it up!