2009:Electrical Main 2.9.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: Start time: 6pm End time: 10pm (I have no idea -Crystal) Member's present: Crystal, Apples, Oranges Night's summary: We drilled holes into the frame and lexan and now have acces...) |
m (Electrical Main 2.9.09 moved to 2009:Electrical Main 2.9.09) |
||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
Start time: 6pm | Start time: 6pm | ||
End time: | End time: 9:30pm | ||
Member's present: Crystal, Apples, Oranges | Member's present: Crystal, Apples, Oranges, Karen | ||
<br> | |||
Night's summary: | |||
*Crystal & Dave S. drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on. Board is bolted on robot. | |||
*Dave B. & Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight. | |||
*we had some of the yummy cake Crystal brought. |
Latest revision as of 14:38, 14 November 2010
Start time: 6pm
End time: 9:30pm
Member's present: Crystal, Apples, Oranges, Karen
Night's summary:
- Crystal & Dave S. drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on. Board is bolted on robot.
- Dave B. & Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
- we had some of the yummy cake Crystal brought.