2009:Electrical Main 2.14.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: ---- 02.14.2009 '''Start time: 10:00'''<br> '''End time: '''<br> '''Members present:  Mike H., Rika Crystal, Sean, Collin, Dave B, Victor, Dave S.'''<br> ---- '''Tasks Complete...)
 
 
(2 intermediate revisions by one other user not shown)
Line 7: Line 7:
'''End time: '''<br>
'''End time: '''<br>


'''Members present:&nbsp; Mike H., Rika Crystal, Sean, Collin, Dave B, Victor, Dave S.'''<br>
'''Members present:&nbsp; Mike H., Rika, Crystal, Sean, Collin, Dave B, Victor, Dave S.'''<br>


----
----
Line 13: Line 13:
'''Tasks Completed:'''<br>
'''Tasks Completed:'''<br>


*Shortened up PWM cables on the robot.
*Shortened up PWM cables on the robot.  
*Mounted electrical board cover
*Mounted electrical board cover  
*Mounted upper spinner shaft encoder
*Mounted upper spinner shaft encoder  
*Rika finished 3rd spare mouse board
*Rika finished 3rd spare mouse board


Line 24: Line 24:
'''Tasks In Progress:'''<br>
'''Tasks In Progress:'''<br>


*neaten up and label robot wiring
*neaten up and label robot wiring  
*watch robot converyor belts fall off.
*watch robot conveyor belts fall off.


<br>
<br>

Latest revision as of 14:38, 14 November 2010


02.14.2009

Start time: 10:00

End time:

Members present:  Mike H., Rika, Crystal, Sean, Collin, Dave B, Victor, Dave S.


Tasks Completed:

  • Shortened up PWM cables on the robot.
  • Mounted electrical board cover
  • Mounted upper spinner shaft encoder
  • Rika finished 3rd spare mouse board



Tasks In Progress:

  • neaten up and label robot wiring
  • watch robot conveyor belts fall off.



Tasks to Complete:

  • task
  • task