1.07.2009 | |||
'''Start Time:''' | |||
<br>- Started inventor work with simple shapes that take up the space they represent to better understand the layout of available space. <br> | '''End Time:''' | ||
'''Members Present: ''' | |||
'''Tasks completed:''' <br>- Worked with Drive Train to conclude to determine the spacing for collection.<br> | |||
- Changed design of the robot created last night. It consists now of 2 rollers, the front roller bringing in balls into a 1x2 hopper (holds about 16 balls). There is a conveyor system in the front which brings the balls up to a top where we were talking about having a curved deflector plate and have the conveyor belts shoot the balls. We haven't excluded the idea of the roller kicking the balls out the front. | |||
- Started inventor work with simple shapes that take up the space they represent to better understand the layout of available space. <br> | |||
'''Tasks to complete:'''<br> | '''Tasks to complete:'''<br> | ||
-Finish available space analysis<br> | -Finish available space analysis<br> | ||
---- | |||
[[Mechanical_2|Mechanical 2 Main Page]] |
Latest revision as of 13:38, 14 November 2010
1.07.2009
Start Time:
End Time:
Members Present:
Tasks completed:
- Worked with Drive Train to conclude to determine the spacing for collection.
- Changed design of the robot created last night. It consists now of 2 rollers, the front roller bringing in balls into a 1x2 hopper (holds about 16 balls). There is a conveyor system in the front which brings the balls up to a top where we were talking about having a curved deflector plate and have the conveyor belts shoot the balls. We haven't excluded the idea of the roller kicking the balls out the front.
- Started inventor work with simple shapes that take up the space they represent to better understand the layout of available space.
Tasks to complete:
-Finish available space analysis