2010:Mechanical 1 01.16: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: Attendence: Becca H and Shauna R (and Graeme) with Mr. K completed: -drew possible designs for the hanging mechanism -the concept is to be able to be able to swing the pneumatics cyli...)
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Attendence: Becca H and Shauna R (and Graeme) with Mr. K
Attendence: Becca H and Shauna R (and Graeme) with Mr. K  


<br>


completed:


completed:
-drew possible designs for the hanging mechanism


-drew possible designs for the hanging mechanism
-the concept is to be able to be able to swing the pneumatics cylinder from side to side so we can get on the tower from either side.


-the concept is to be able to be able to swing the pneumatics cylinder from side to side so we can get on the tower from either side.
-prototyped the proof of the concept  


-prototyped the proof of the concept
<br>


needed:


we have to know the coefficient of friction between the bumper materials and the tower


needed:
<br>


we have to know the coefficient of friction between the bumper materials and the tower
[[Image:Scratch_sheet_1_1.jpeg]]<br>
 
<br>

Latest revision as of 13:09, 17 January 2010

Attendence: Becca H and Shauna R (and Graeme) with Mr. K


completed:

-drew possible designs for the hanging mechanism

-the concept is to be able to be able to swing the pneumatics cylinder from side to side so we can get on the tower from either side.

-prototyped the proof of the concept


needed:

we have to know the coefficient of friction between the bumper materials and the tower


Scratch sheet 1 1.jpeg